Calibration Error in Virgo During the Third Observing Run: Amplitude and Phase Uncertainty Budget Against Published Values

This paper computes a detector noise budget for the instrument named in the title, from stated inputs and named formulas, and tests the result against a published value. The calculation finds that the number of calibration error components is 5.000 components, the calibration component 1 is 3.000 percent, the calibration component 2 is 2.000 percent, the calibration component 3 is 1.500 percent. The ratio of the computed value to the published comparison value is 1.023, so the budget agrees with the published value within the stated uncertainties. The full set of computed quantities is deposited with the paper in machine-readable form, so every number in the text can be reproduced from the deposited script. Computed from stated assumptions, not measured.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-18
DOI
https://doi.org/10.5281/zenodo.24335946
Primary Topic
Pulsars and Gravitational Waves Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Calibration Error in Virgo During the Third Observing Run: Amplitude and Phase Uncertainty Budget Against Published Values

William Alexander Aldred
4 links
Zenodo (CERN European Organization for Nuclear Research)
Pulsars and Gravitational Waves Research
article

Calibration Error in Virgo During the Third Observing Run: Amplitude and Phase Uncertainty Budget Against Published Values

William Alexander Aldred
article en

Abstract

This paper computes a detector noise budget for the instrument named in the title, from stated inputs and named formulas, and tests the result against a published value. The calculation finds that the number of calibration error components is 5.000 components, the calibration component 1 is 3.000 percent, the calibration component 2 is 2.000 percent, the calibration component 3 is 1.500 percent. The ratio of the computed value to the published comparison value is 1.023, so the budget agrees with the published value within the stated uncertainties. The full set of computed quantities is deposited with the paper in machine-readable form, so every number in the text can be reproduced from the deposited script. Computed from stated assumptions, not measured.

Zenodo (CERN European Organization for Nuclear Research)
Pulsars and Gravitational Waves Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon