Project Monitoring Planning, Monitoring Implementation and Performance of Water Pan Projects in Isiolo County, Kenya
Water pans are a major investment for water security in Kenya's Arid and Semi-Arid Lands, yet many lose functionality soon after construction. This study examined the relationship between project monitoring planning, monitoring implementation and the performance of water pan projects in Isiolo County, Kenya. It was guided by two specific objectives: to determine the relationship between project monitoring planning and the performance of water pan projects, and to assess the relationship between monitoring implementation and the performance of water pan projects. The study drew on Results-Based Management and Control Theory. A descriptive cross-sectional survey design was adopted. The target population comprised 320 stakeholders involved in the planning, implementation, monitoring, evaluation and management of water pan projects in Isiolo County. A sample of 178 respondents was selected through stratified, purposive and simple random sampling, and 158 usable questionnaires were analysed, representing a response rate of 88.8%. Data were analysed using frequencies, percentages, means, standard deviations, Cronbach's alpha and Pearson's product-moment correlation. Respondents agreed that both practices were applied. Monitoring implementation recorded a mean of 4.05 (SD = 0.71) and project monitoring planning a mean of 3.91 (SD = 0.76). The mean performance score was 3.94 (SD = 0.74). Both practices had strong, positive and statistically significant relationships with project performance: monitoring implementation (r = 0.728, p < 0.001) and project monitoring planning (r = 0.641, p < 0.001). Availability of baseline information, resources for monitoring and stakeholder participation in monitoring were the lowest-rated items. The study concluded that both practices are positively associated with the performance of water pan projects. It recommends documented monitoring frameworks with baselines and budgets, regular monitoring visits and formal inclusion of community committees in monitoring. Keywords: Monitoring and Evaluation, Monitoring Planning, Monitoring Implementation, Project Performance, Water Pans, Isiolo County
Authors
- Ezekiah Kimani
- Amina Osman
Institutions
- Jomo Kenyatta University of Agriculture and Technology (KE)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-18
- DOI
- https://doi.org/10.5281/zenodo.24333345
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00