Unveiling the Dynamic Propagation of Schedule Risks in Prefabricated Construction Using the Epidemic Model

Prefabricated construction relies on tightly coupled component production, transportation, and on-site installation. Local disruptions may affect project schedules via exposure, infection, recovery, and renewed susceptibility, yet the underlying dynamic mechanisms remain poorly understood. To address this gap, this study shifts the analytical focus from aggregate project schedule performance to the risk states of individual activities and the transitions between these states. A SEIRS (Susceptible–Exposed–Infected–Recovered–Susceptible)-based schedule-risk propagation model is formulated; its equilibrium points and propagation threshold are derived, and numerical scenarios are adopted to investigate the effects of risk propagation, exposure-to-infection transition, recovery, and loss of protection. Under the specified scenarios, the system converges to a nonzero-risk equilibrium when h < 1, whereas risks gradually dissipate when h ≥ 1. Variations in the propagation rate α and recovery rate γ can shift the system across the critical threshold and alter whether risks persist or dissipate. The exposure-to-infection rate β affects the manifestation of risks but does not change the ultimate risk-free outcome within the investigated parameter range. The protection-loss rate μ primarily modulates the proportions of susceptible and recovered nodes, with relatively limited effects on exposed and infected nodes. These findings indicate that schedule-risk management should integrate early propagation control, timely intervention for latent disruptions, and recovery and protection after risk infection. This study establishes a theoretical framework for understanding schedule-risk state transitions in prefabricated construction and facilitates its extended practical application.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2026-11-18
DOI
https://doi.org/10.3390/buildings16224591
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Unveiling the Dynamic Propagation of Schedule Risks in Prefabricated Construction Using the Epidemic Model

Qianmai Luo, Yiyi Ye
2 links
Buildings
Construction Project Management and Performance
article

Unveiling the Dynamic Propagation of Schedule Risks in Prefabricated Construction Using the Epidemic Model

Qianmai Luo, Yiyi Ye
article en

Abstract

Prefabricated construction relies on tightly coupled component production, transportation, and on-site installation. Local disruptions may affect project schedules via exposure, infection, recovery, and renewed susceptibility, yet the underlying dynamic mechanisms remain poorly understood. To address this gap, this study shifts the analytical focus from aggregate project schedule performance to the risk states of individual activities and the transitions between these states. A SEIRS (Susceptible–Exposed–Infected–Recovered–Susceptible)-based schedule-risk propagation model is formulated; its equilibrium points and propagation threshold are derived, and numerical scenarios are adopted to investigate the effects of risk propagation, exposure-to-infection transition, recovery, and loss of protection. Under the specified scenarios, the system converges to a nonzero-risk equilibrium when h < 1, whereas risks gradually dissipate when h ≥ 1. Variations in the propagation rate α and recovery rate γ can shift the system across the critical threshold and alter whether risks persist or dissipate. The exposure-to-infection rate β affects the manifestation of risks but does not change the ultimate risk-free outcome within the investigated parameter range. The protection-loss rate μ primarily modulates the proportions of susceptible and recovered nodes, with relatively limited effects on exposed and infected nodes. These findings indicate that schedule-risk management should integrate early propagation control, timely intervention for latent disruptions, and recovery and protection after risk infection. This study establishes a theoretical framework for understanding schedule-risk state transitions in prefabricated construction and facilitates its extended practical application.

BuildingsVol. 16(22)
Tongji University (CN)
National Natural Science Foundation of China
Industry, innovation and infrastructure
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon