Sulfate removal and recovery of metal sulfides from acid mine drainage through biological sulfide generation in an anaerobic membrane bioreactor

This study presents a pilot-scale train for acid mine drainage (AMD) valorization at the Tharsis mining district (Huelva, Spain), integrating selective Fe/Al removal by controlled neutralization, biological sulfide production in an anaerobic sulfate-reducing membrane bioreactor (AnMBR) fed with glycerin, metal sulfide precipitation, and ion-exchange (IEX) polishing. Neutralization removed >99% of Fe and 80–95% of Al while preserving Zn, Co and Ni in solution, although Cu was partially co-precipitated (54%). The AnMBR was operated for 260 days across four phases of increasing sulfate loads. It achieved up to 95% sulfate removal with reduction rates reaching 4,662 mg SO₄ 2− L −1 d −1 and dissolved sulfide concentrations up to 300 mg L −1 . Additionally, the system successfully adapted to the transition from synthetic feed to real IEX effluent. In the precipitation unit, removal was sequential: Cu was quantitatively removed across all conditions, Zn was removed progressively with increasing sulfide availability, and Co and Ni required both higher sulfide availability and pH above 5.5, so that the sulfide-to-metal ratio determined the extent of recovery of each metal. Sludge was enriched in Zn- and Cu-bearing sulfides, with a (Zn + Cu)/S molar ratio consistent with sulfide stoichiometry. The IEX step retained Co (98%), Ni (97%) and Zn (89%), limiting the metal load recirculated to the bioreactor. A pilot-based cost assessment showed that the AnMBR accounted for 73% of the operating cost, mainly due to electron donor and nutrient supply. These results provide engineering data for the scale-up of biologically driven AMD treatment combining metal recovery, sulfate reduction and potential water valorization.

Authors

Institutions

Publication Details

Journal
Journal of Water Process Engineering
Published
2026-11-18
DOI
https://doi.org/10.1016/j.jwpe.2026.111251
Primary Topic
Mine drainage and remediation techniques
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Sulfate removal and recovery of metal sulfides from acid mine drainage through biological sulfide generation in an anaerobic membrane bioreactor

M. Sevilla, C. Echevarría, J. L. Cortina, J. López et al.
Journal of Water Process Engineering
Mine drainage and remediation techniques
article

Sulfate removal and recovery of metal sulfides from acid mine drainage through biological sulfide generation in an anaerobic membrane bioreactor

M. Sevilla, C. Echevarría, J. L. Cortina, J. López, R. Miró Llorente, B. Ahumada-Vargas, S. Matencio, G. Parramon, E. Licon, T. Martínez-Santos, L. Fernandez-Rojo
article en

Abstract

This study presents a pilot-scale train for acid mine drainage (AMD) valorization at the Tharsis mining district (Huelva, Spain), integrating selective Fe/Al removal by controlled neutralization, biological sulfide production in an anaerobic sulfate-reducing membrane bioreactor (AnMBR) fed with glycerin, metal sulfide precipitation, and ion-exchange (IEX) polishing. Neutralization removed >99% of Fe and 80–95% of Al while preserving Zn, Co and Ni in solution, although Cu was partially co-precipitated (54%). The AnMBR was operated for 260 days across four phases of increasing sulfate loads. It achieved up to 95% sulfate removal with reduction rates reaching 4,662 mg SO₄ 2− L −1 d −1 and dissolved sulfide concentrations up to 300 mg L −1 . Additionally, the system successfully adapted to the transition from synthetic feed to real IEX effluent. In the precipitation unit, removal was sequential: Cu was quantitatively removed across all conditions, Zn was removed progressively with increasing sulfide availability, and Co and Ni required both higher sulfide availability and pH above 5.5, so that the sulfide-to-metal ratio determined the extent of recovery of each metal. Sludge was enriched in Zn- and Cu-bearing sulfides, with a (Zn + Cu)/S molar ratio consistent with sulfide stoichiometry. The IEX step retained Co (98%), Ni (97%) and Zn (89%), limiting the metal load recirculated to the bioreactor. A pilot-based cost assessment showed that the AnMBR accounted for 73% of the operating cost, mainly due to electron donor and nutrient supply. These results provide engineering data for the scale-up of biologically driven AMD treatment combining metal recovery, sulfate reduction and potential water valorization.

Journal of Water Process EngineeringVol. 94
Centro Tecnológico del Agua (ES), Universitat Politècnica de Catalunya (ES)
HORIZON EUROPE Framework Programme
Responsible consumption and production, Clean water and sanitation
Mine drainage and remediation techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon