Horizontal Product Branch (HPB): A Practitioner's Methodology for Planning and Tracing Product Evolution across Hardware, Firmware and Software

For more than seven years I have managed complete products as a senior product manager: hardware, firmware and software, across a large portfolio with constant rotation of references, improvement requests and competitive pressure. Backlogs, Kanban, Scrum, roadmaps, Stage-Gate and PLM change orders each solve part of that job, but none answers the questions I am asked every week: from which version did this work start, what else is running on the same product, and which release actually closed it. Software teams answer exactly these questions for code with branch-and-merge. The Horizontal Product Branch (HPB) methodology applies branch-and-merge to the product, not to the code: every piece of work is a typed branch that forks from a released version and ends in a named release or in a discard with a written reason. This paper defines HPB through seven rules, a standard notation, an operating guide and metrics that fall out of the graph. It also presents HPB Markup, an open-source text language that draws HPB diagrams from a few lines of text in HTML, React, Next.js, Vite or the command line, and a prototype built into a product management portal. Version 1.0 of the methodology. The method text and notation are released under CC BY 4.0; the LaTeX notation package (hpb.sty) and the HPB Markup toolkit are released under the MIT License.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-18
DOI
https://doi.org/10.5281/zenodo.24355434
Primary Topic
Software Engineering Techniques and Practices
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Horizontal Product Branch (HPB): A Practitioner's Methodology for Planning and Tracing Product Evolution across Hardware, Firmware and Software

Achraf Bouchtarouif El Khiat
Zenodo (CERN European Organization for Nuclear Research)
Software Engineering Techniques and Practices
preprint

Horizontal Product Branch (HPB): A Practitioner's Methodology for Planning and Tracing Product Evolution across Hardware, Firmware and Software

Achraf Bouchtarouif El Khiat
preprint en

Abstract

For more than seven years I have managed complete products as a senior product manager: hardware, firmware and software, across a large portfolio with constant rotation of references, improvement requests and competitive pressure. Backlogs, Kanban, Scrum, roadmaps, Stage-Gate and PLM change orders each solve part of that job, but none answers the questions I am asked every week: from which version did this work start, what else is running on the same product, and which release actually closed it. Software teams answer exactly these questions for code with branch-and-merge. The Horizontal Product Branch (HPB) methodology applies branch-and-merge to the product, not to the code: every piece of work is a typed branch that forks from a released version and ends in a named release or in a discard with a written reason. This paper defines HPB through seven rules, a standard notation, an operating guide and metrics that fall out of the graph. It also presents HPB Markup, an open-source text language that draws HPB diagrams from a few lines of text in HTML, React, Next.js, Vite or the command line, and a prototype built into a product management portal. Version 1.0 of the methodology. The method text and notation are released under CC BY 4.0; the LaTeX notation package (hpb.sty) and the HPB Markup toolkit are released under the MIT License.

Zenodo (CERN European Organization for Nuclear Research)
Software Engineering Techniques and Practices
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon