COMPARATIVE ASSESSMENT OF SERVICE DELIVERY ARRANGEMENTS AND A LOCALISATION INDEX FOR SOLAR POWER PLANT OPERATION

The operation and maintenance of a large solar power plant can be organised through three service delivery arrangements: a construction contractor, the project sponsor's service company, or a local service team. This article compares the three arrangements using a unified monetary framework in which annual costs incorporate revenue losses associated with reduced plant availability. It also proposes a localisation index defined as the proportion of operating expenditure retained within the national economy. For the 100 MW Nur Navoiy Solar power plant, annual costs amount to USD 2.71 million under the contractor-based arrangement, USD 1.57 million under the sponsor's service company, and USD 1.31 million under the localised service arrangement with personnel training. The corresponding localisation index increases from 18.2% to 52.4% and 68.5%, respectively. The annual cost savings of USD 259 thousand are maintained unless the remuneration premium for a foreign specialist falls below USD 3.1 thousand or plant availability under local service alone falls below 95.3%. A preliminary five-criteria assessment ranks the localised arrangement first in 74% of randomly generated weight vectors, although the final ranking depends on the weight assigned to contractual accountability. The scientific novelty lies in integrating a cost assessment framework that incorporates the monetary value of plant availability, a measurable localisation index, and a comprehensive weight-space analysis. The assumptions regarding remuneration, spare parts costs, and changes in plant availability require further verification using actual plant operating records.

Authors

Institutions

Publication Details

Journal
ECONOSCITECH INTEGRATION
Published
2026-11-18
DOI
https://doi.org/10.5281/zenodo.24347960
Primary Topic
Outsourcing and Supply Chain Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

COMPARATIVE ASSESSMENT OF SERVICE DELIVERY ARRANGEMENTS AND A LOCALISATION INDEX FOR SOLAR POWER PLANT OPERATION

Dilmurod Jumaboyev
ECONOSCITECH INTEGRATION
Outsourcing and Supply Chain Management
article

COMPARATIVE ASSESSMENT OF SERVICE DELIVERY ARRANGEMENTS AND A LOCALISATION INDEX FOR SOLAR POWER PLANT OPERATION

Dilmurod Jumaboyev
article en

Abstract

The operation and maintenance of a large solar power plant can be organised through three service delivery arrangements: a construction contractor, the project sponsor's service company, or a local service team. This article compares the three arrangements using a unified monetary framework in which annual costs incorporate revenue losses associated with reduced plant availability. It also proposes a localisation index defined as the proportion of operating expenditure retained within the national economy. For the 100 MW Nur Navoiy Solar power plant, annual costs amount to USD 2.71 million under the contractor-based arrangement, USD 1.57 million under the sponsor's service company, and USD 1.31 million under the localised service arrangement with personnel training. The corresponding localisation index increases from 18.2% to 52.4% and 68.5%, respectively. The annual cost savings of USD 259 thousand are maintained unless the remuneration premium for a foreign specialist falls below USD 3.1 thousand or plant availability under local service alone falls below 95.3%. A preliminary five-criteria assessment ranks the localised arrangement first in 74% of randomly generated weight vectors, although the final ranking depends on the weight assigned to contractual accountability. The scientific novelty lies in integrating a cost assessment framework that incorporates the monetary value of plant availability, a measurable localisation index, and a comprehensive weight-space analysis. The assumptions regarding remuneration, spare parts costs, and changes in plant availability require further verification using actual plant operating records.

ECONOSCITECH INTEGRATION
Kurgan State University (RU), Fergana State Technical University (UZ)
Affordable and clean energy, Industry, innovation and infrastructure
Outsourcing and Supply Chain Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon