The Locality Loophole: A Timing Budget from the 1998 Strict-Locality Photon Test
Light needs 1,334.26 nanoseconds to cross 400 metres while the measurement window was 100 nanoseconds, a timing margin of 1,234.26 nanoseconds, and the test measured a CHSH value of 2.73. This paper works out the full budget behind that headline: the margin above the bound it is tested against, the statistical significance of the violation, and the supporting quantities that determine how much the result proves. Every number in the paper is computed from the published inputs by the deposited code, and the assumptions behind each number are stated alongside it so that the whole argument can be checked rather than taken on trust.
Authors
- William Alexander Aldred (ORCID: https://orcid.org/0009-0000-1215-577X)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-18
- DOI
- https://doi.org/10.5281/zenodo.24331649
- Primary Topic
- Quantum Mechanics and Applications
- Type
- article
- Field-Weighted Citation Impact
- 0.00