Firm Inertia From Grid-Forming Wind Turbines: Closed-Form Availability Theory and Storage-Free Enhancement

Preprint of a manuscript submitted to IEEE Transactions on Sustainable Energy. The PDF contains the paper (10 pages) and its supplement (4 pages). Code, OpenFAST inputs and results: https://doi.org/10.5281/zenodo.24327514 Since January 2026, German system operators pay 805 to 888.5 EUR per MWs and year for inertia available in at least 90% of a year's quarter-hours. For a grid-forming wind turbine what matters is firm inertia, the inertia guaranteed at that availability. The capability is the minimum of four limits—converter current, generator torque, kinetic energy and speed recovery. Its unimodality in wind speed, proven under stated conditions, makes the availability constraint an exact wind-speed interval and the inertia duration curve closed-form for any wind distribution. The theory exposes a rated-wind cliff: firm inertia equals the above-rated capability, set by torque and converter headroom (1.12 s for the IEA 15-MW turbine, which OpenFAST confirms within 4%). Two storage-free levers follow: a 5% speed lift raises the cliff to 1.75 s with a 1.2-pu grid-side converter, and idling below cut-in raises availability from 94% to 98%. Together they raise premium revenue by 62%, or by 32% to 45% net of the lift's steady-state energy cost. Settlement judges quarter-hour means. For delivery at any instant in class-B turbulence from 7 to 25 m/s, a power cap and a faster minimum-speed loop support 0.88 and 1.42 s 99% of the time (1.00 and 1.56 s offshore), but cost 0.2% to 0.6% of the annual energy with our controller settings, worth 0.4 to 3.8 times the premium. At four offshore sites (28 calendar years at three), the lifted offer stays eligible every year, including wake-affected years when the baseline fails the strict count.

Authors

Institutions

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-18
DOI
https://doi.org/10.5281/zenodo.24330295
Primary Topic
Wind Turbine Control Systems
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

Firm Inertia From Grid-Forming Wind Turbines: Closed-Form Availability Theory and Storage-Free Enhancement

Yuan Shen
6 links
Zenodo (CERN European Organization for Nuclear Research)
Wind Turbine Control Systems
preprint

Firm Inertia From Grid-Forming Wind Turbines: Closed-Form Availability Theory and Storage-Free Enhancement

Yuan Shen
preprint en

Abstract

Preprint of a manuscript submitted to IEEE Transactions on Sustainable Energy. The PDF contains the paper (10 pages) and its supplement (4 pages). Code, OpenFAST inputs and results: https://doi.org/10.5281/zenodo.24327514 Since January 2026, German system operators pay 805 to 888.5 EUR per MWs and year for inertia available in at least 90% of a year's quarter-hours. For a grid-forming wind turbine what matters is firm inertia, the inertia guaranteed at that availability. The capability is the minimum of four limits—converter current, generator torque, kinetic energy and speed recovery. Its unimodality in wind speed, proven under stated conditions, makes the availability constraint an exact wind-speed interval and the inertia duration curve closed-form for any wind distribution. The theory exposes a rated-wind cliff: firm inertia equals the above-rated capability, set by torque and converter headroom (1.12 s for the IEA 15-MW turbine, which OpenFAST confirms within 4%). Two storage-free levers follow: a 5% speed lift raises the cliff to 1.75 s with a 1.2-pu grid-side converter, and idling below cut-in raises availability from 94% to 98%. Together they raise premium revenue by 62%, or by 32% to 45% net of the lift's steady-state energy cost. Settlement judges quarter-hour means. For delivery at any instant in class-B turbulence from 7 to 25 m/s, a power cap and a faster minimum-speed loop support 0.88 and 1.42 s 99% of the time (1.00 and 1.56 s offshore), but cost 0.2% to 0.6% of the annual energy with our controller settings, worth 0.4 to 3.8 times the premium. At four offshore sites (28 calendar years at three), the lifted offer stays eligible every year, including wake-affected years when the baseline fails the strict count.

Zenodo (CERN European Organization for Nuclear Research)
University of British Columbia, Okanagan Campus (CA)
Affordable and clean energy, Industry, innovation and infrastructure, Climate action
Wind Turbine Control Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon