HIL-based conformance testing: benchmarking IEC 61850 GOOSE transfer times across multi-vendor IEDs
The IEC 61850 standard is essential for interoperability of modern electrical substations. Its GOOSE protocol ensures high-speed transmission of critical events between intelligent electronic devices, which must comply with strict IEC 61850-10 transfer time requirements. This paper presents a hardware-in-the-loop virtual commissioning method for device conformance testing. Utilizing real-time simulation, a standardized “ping-pong method” test was implemented to monitor data traffic across multi-vendor devices. Performance was validated through 1,000 statistical trials per device in accordance with IEC 61850-10. Results demonstrate that all evaluated equipment operated within normative transfer time limits, successfully satisfying the Gpf1/TT6 performance criteria and highlighting HIL simulation as a robust solution for testing automated power systems.
Authors
- Laura Fernández Silveira (ORCID: https://orcid.org/0009-0003-7486-8873)
- Maurício Sperandio (ORCID: https://orcid.org/0000-0003-4507-8437)
- Martin Wolter (ORCID: https://orcid.org/0000-0003-0281-0501)
- Luiz Fernando Freitas-Gutierres (ORCID: https://orcid.org/0000-0002-6254-7306)
- Adriano Peres de Morais (ORCID: https://orcid.org/0000-0001-8923-330X)
- João Pedro Scherer Cipriani (ORCID: https://orcid.org/0000-0002-7775-8069)
- Jhonatan Antônio Cassol (ORCID: https://orcid.org/0000-0002-3988-6764)
- Bruna Rafaela dos Santos Diana
Institutions
- Universidade Federal de Santa Maria (BR)
- Technische Universität Dresden (DE)
- Otto-von-Guericke-Universität Magdeburg (DE)
Publication Details
- Journal
- at - Automatisierungstechnik
- Published
- 2026-11-18
- DOI
- https://doi.org/10.1515/auto-2026-0142
- Primary Topic
- Power Systems and Technologies
- Type
- article
- Field-Weighted Citation Impact
- 0.00