Wyoming Winter Trip: RL Scheduling A/B Test vs Manual, 40% Gate
RL-assisted Wyoming winter scheduling needs a 40% A/B win over manual planning, but grounded evidence tops out at 28.57%. See the full test. Independent technical note mirroring the canonical version: https://smarttripai.com/blog/wyoming-winter-trip-rl-scheduling-ab-test-vs-manual-40-gate.php
Authors
- Anna Rose
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-18
- DOI
- https://doi.org/10.5281/zenodo.24335628
- Primary Topic
- Air Traffic Management and Optimization
- Type
- preprint