Towards Sustainable Management of Wastewater Stabilization Ponds: An Integrated Framework Linking Sludge Accumulation, Hydraulic Restoration, and Condition-Based Maintenance

Wastewater stabilization ponds (WSPs) provide low-energy municipal wastewater treatment, but sludge accumulation reduces available pond volume. This observational case study examined phased desludging and treatment performance using nine years (2017–2025) of monitoring at one full-scale WSP system. Bathymetric surveys were integrated with routine physicochemical monitoring and multivariate statistical analyses to investigate the relationships among sludge accumulation, hydraulic restoration, and treatment performance. Process efficiency was assessed using biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total suspended solids (TSS), dissolved oxygen (DO), and hydraulic loading data. Operational bathymetric summaries indicated an estimated sludge occupation of approximately 92% in the most affected anaerobic ponds. Comparing the pre-desludging (2017–2019) and post-desludging (2024–2025) periods, mean BOD5 removal increased from 68.52 ± 5.75% to 80.43 ± 3.61% and TSS removal from 65.11 ± 5.10% to 83.23 ± 3.18% (both p < 0.001). COD removal decreased from 64.36 ± 5.81% to 60.78 ± 6.79% (p = 0.043), despite a decrease in final effluent COD concentration from 330.6 ± 74.5 to 158.0 ± 32.5 mg L−1. Influent COD concentration and load also declined substantially, limiting attribution of the effluent change to desludging. Phased desludging restored available pond volume and coincided with changes in treatment performance. Together, sludge-depth surveys and operational monitoring can inform condition-based maintenance. The single-site observational design, changing influent loads, and absence of direct hydraulic tracer measurements preclude a causal attribution of the observed performance changes.

Authors

Institutions

Publication Details

Journal
Clean Technologies
Published
2026-11-18
DOI
https://doi.org/10.3390/cleantechnol8060190
Primary Topic
Wastewater Treatment and Nitrogen Removal
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Towards Sustainable Management of Wastewater Stabilization Ponds: An Integrated Framework Linking Sludge Accumulation, Hydraulic Restoration, and Condition-Based Maintenance

Souad El Hajjaji, Najoua Labjar, Hicham Zahir, Yassir Chiguer et al.
Clean Technologies
Wastewater Treatment and Nitrogen Removal
article

Towards Sustainable Management of Wastewater Stabilization Ponds: An Integrated Framework Linking Sludge Accumulation, Hydraulic Restoration, and Condition-Based Maintenance

Souad El Hajjaji, Najoua Labjar, Hicham Zahir, Yassir Chiguer, Mohammed Sbai
article en

Abstract

Wastewater stabilization ponds (WSPs) provide low-energy municipal wastewater treatment, but sludge accumulation reduces available pond volume. This observational case study examined phased desludging and treatment performance using nine years (2017–2025) of monitoring at one full-scale WSP system. Bathymetric surveys were integrated with routine physicochemical monitoring and multivariate statistical analyses to investigate the relationships among sludge accumulation, hydraulic restoration, and treatment performance. Process efficiency was assessed using biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total suspended solids (TSS), dissolved oxygen (DO), and hydraulic loading data. Operational bathymetric summaries indicated an estimated sludge occupation of approximately 92% in the most affected anaerobic ponds. Comparing the pre-desludging (2017–2019) and post-desludging (2024–2025) periods, mean BOD5 removal increased from 68.52 ± 5.75% to 80.43 ± 3.61% and TSS removal from 65.11 ± 5.10% to 83.23 ± 3.18% (both p < 0.001). COD removal decreased from 64.36 ± 5.81% to 60.78 ± 6.79% (p = 0.043), despite a decrease in final effluent COD concentration from 330.6 ± 74.5 to 158.0 ± 32.5 mg L−1. Influent COD concentration and load also declined substantially, limiting attribution of the effluent change to desludging. Phased desludging restored available pond volume and coincided with changes in treatment performance. Together, sludge-depth surveys and operational monitoring can inform condition-based maintenance. The single-site observational design, changing influent loads, and absence of direct hydraulic tracer measurements preclude a causal attribution of the observed performance changes.

Clean TechnologiesVol. 8(6)
Mohammed V University (MA), Sidi Mohamed Ben Abdellah University (MA)
Clean water and sanitation, Responsible consumption and production
Wastewater Treatment and Nitrogen Removal
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon