A SWOT analysis of employees’ perspectives on the application of Last Planner System in a construction company in Kazazhastan

Business competitiveness, survival and growth needs, as well as innovations in the construction industry are driving organisations to make strategic decisions to modify their traditional management systems. Lean Construction, a construction project management methodology with its roots in Lean Management in the manufacturing industry, has been developing since the 1990s. A method included in this methodology is the Last Planner System (LPS), a construction planning method. At the beginning of the 21st century, the Kazakh company BI Group took the strategic decision to implement the Lean Construction methodology in its project management, in particular the LPS. This company is explored as a case study with the aim of identifying the factors that have affected the Last Planner System implementation through a SWOT analysis (Strengths, Weaknesses, Opportunities, Threats). For this purpose, semi-structured interviews were conducted with professionals from BI Group and a qualitative analysis was carried out using the QDA Miner Lite programme. A total of 16 factors are identified, with employee resistance to change as a weakness, and increased transparency and team responsibility as strengths. The threats highlighted are the need for continued investment to maintain the system, while opportunities include enhanced interaction with subconstractors and improved service quality. The strategic decision of implementing LPS has brought positive results for the company, improving its competitiveness and corporate image. The factors identified may be useful to other construction companies, of similar or different sizes, that wish to implement this method to manage their construction works.

Authors

Publication Details

Journal
South Florida Journal of Development
Published
2026-11-16
DOI
https://doi.org/10.46932/sfjdv7n11-012
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

A SWOT analysis of employees’ perspectives on the application of Last Planner System in a construction company in Kazazhastan

Elena Navarro-Astor, Nelia Valverde Gascueña, Diana Sadvokassova, Joaquín Fuentes-del-Burgo
South Florida Journal of Development
BIM and Construction Integration
article

A SWOT analysis of employees’ perspectives on the application of Last Planner System in a construction company in Kazazhastan

Elena Navarro-Astor, Nelia Valverde Gascueña, Diana Sadvokassova, Joaquín Fuentes-del-Burgo
article en

Abstract

Business competitiveness, survival and growth needs, as well as innovations in the construction industry are driving organisations to make strategic decisions to modify their traditional management systems. Lean Construction, a construction project management methodology with its roots in Lean Management in the manufacturing industry, has been developing since the 1990s. A method included in this methodology is the Last Planner System (LPS), a construction planning method. At the beginning of the 21st century, the Kazakh company BI Group took the strategic decision to implement the Lean Construction methodology in its project management, in particular the LPS. This company is explored as a case study with the aim of identifying the factors that have affected the Last Planner System implementation through a SWOT analysis (Strengths, Weaknesses, Opportunities, Threats). For this purpose, semi-structured interviews were conducted with professionals from BI Group and a qualitative analysis was carried out using the QDA Miner Lite programme. A total of 16 factors are identified, with employee resistance to change as a weakness, and increased transparency and team responsibility as strengths. The threats highlighted are the need for continued investment to maintain the system, while opportunities include enhanced interaction with subconstractors and improved service quality. The strategic decision of implementing LPS has brought positive results for the company, improving its competitiveness and corporate image. The factors identified may be useful to other construction companies, of similar or different sizes, that wish to implement this method to manage their construction works.

South Florida Journal of DevelopmentVol. 7(11)
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon