Effect of Project Planning Practices on Performance of Mining Projects: A Case of Bugarama Wolfram Mining Project in Burera District, Rwanda

This study examined the effect of project planning practices on performance of Bugarama Wolfram Mining Project in Burera District, Rwanda.Project resource planning, risk mitigation planning, stakeholders engagement planning, and monitoring and evaluation planning were assessed as predictors of project performance.Resource-Based View Theory, Complexity Theory, Stakeholder Theory, and Theory of Constraints guided the study.Descriptive and correlational research designs were adopted using quantitative and qualitative approaches.The target population comprised 189 project actors, all of whom were included through a census approach; 181 complete questionnaires were returned, representing a 95.8% response rate.Questionnaires, interviews, and documentation generated the study data, while the complete questionnaires were analysed using SPSS version 29 through descriptive statistics, Pearson correlation, and multiple linear regression.Regression results showed positive and statistically significant effects for project resource planning (B = 0.326; t = 6.792; p = 0.000), risk mitigation planning (B = 0.118; t = 2.622; p = 0.010), stakeholders engagement planning (B = 0.265; t = 6.310; p = 0.000), and monitoring and evaluation planning (B = 0.143; t = 3.043; p = 0.003).The model explained 95.3% of variation in project performance.The study concluded that integrated planning practices strengthened mining project performance and recommended coordinated resource schedules, active risk registers, structured stakeholder engagement, and results-based monitoring systems.

Publication Details

Journal
Journal of Research Innovation and Implications in Education
Published
2026-11-17
DOI
https://doi.org/10.59765/hdr7d3
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Effect of Project Planning Practices on Performance of Mining Projects: A Case of Bugarama Wolfram Mining Project in Burera District, Rwanda

6 links
Journal of Research Innovation and Implications in Education
Construction Project Management and Performance
article

Effect of Project Planning Practices on Performance of Mining Projects: A Case of Bugarama Wolfram Mining Project in Burera District, Rwanda

article en

Abstract

This study examined the effect of project planning practices on performance of Bugarama Wolfram Mining Project in Burera District, Rwanda.Project resource planning, risk mitigation planning, stakeholders engagement planning, and monitoring and evaluation planning were assessed as predictors of project performance.Resource-Based View Theory, Complexity Theory, Stakeholder Theory, and Theory of Constraints guided the study.Descriptive and correlational research designs were adopted using quantitative and qualitative approaches.The target population comprised 189 project actors, all of whom were included through a census approach; 181 complete questionnaires were returned, representing a 95.8% response rate.Questionnaires, interviews, and documentation generated the study data, while the complete questionnaires were analysed using SPSS version 29 through descriptive statistics, Pearson correlation, and multiple linear regression.Regression results showed positive and statistically significant effects for project resource planning (B = 0.326; t = 6.792; p = 0.000), risk mitigation planning (B = 0.118; t = 2.622; p = 0.010), stakeholders engagement planning (B = 0.265; t = 6.310; p = 0.000), and monitoring and evaluation planning (B = 0.143; t = 3.043; p = 0.003).The model explained 95.3% of variation in project performance.The study concluded that integrated planning practices strengthened mining project performance and recommended coordinated resource schedules, active risk registers, structured stakeholder engagement, and results-based monitoring systems.

Journal of Research Innovation and Implications in Education
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon