Spatial assessment of forest biomass supply and cost-optimal bioenergy plant locations in Castilla y León, Spain

Where bioenergy plants can be supplied economically depends on the distribution and delivered cost of harvestable forest biomass, but regional estimates miss the fine-scale variation in availability, terrain and transport. This study develops a geospatial framework to assess annual forest biomass supply and identify cost-effective bioenergy plant locations in Castilla y León, Spain. Hectare-level aboveground biomass (AGB), predicted by machine learning from GEDI spaceborne lidar, Sentinel-1/2, terrain and canopy-height data ( R 2 = 0.70 on independent test blocks), distributes, rather than increases, official municipal estimates of annual stem-wood increment; slope, legal protection, recent fires and mobilisation scenarios determine the eligible supply. Delivered costs integrate handling, terrain-dependent forwarder extraction and road transport. Candidate locations are evaluated for five plant-demand classes by accumulating biomass in order of delivered cost. With 10% of the eligible increment mobilised (260 Gg yr −1 of dry mass), district-heating and small combined heat and power plants can be supplied at 57.6–64.4 € Mg −1 , of which location-independent handling accounts for 87%–98%, whereas 10–20 MW e power plants become feasible only when 30% is mobilised. AGB-based allocation shifts supply towards denser stands but leaves the preferred locations largely unchanged, and favourable locations form connected supply basins rather than isolated points. Diesel emissions from extraction and transport, 22–25 kg CO 2 e Mg −1 , vary little among locations. Plant feasibility depends strongly on the mobilisable share of annual increment, which must be distinguished from theoretical growth. The framework reproducibly links fine-scale biomass mapping with supply-cost assessment and bioenergy planning.

Authors

Institutions

Publication Details

Journal
Biomass and Bioenergy
Published
2026-11-17
DOI
https://doi.org/10.1016/j.biombioe.2026.110285
Primary Topic
Forest Biomass Utilization and Management
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Spatial assessment of forest biomass supply and cost-optimal bioenergy plant locations in Castilla y León, Spain

Diego Caso, Belén Pérez-Lancho, Ana Belén Gil González, Darío López Ramos
Biomass and Bioenergy
Forest Biomass Utilization and Management
article

Spatial assessment of forest biomass supply and cost-optimal bioenergy plant locations in Castilla y León, Spain

Diego Caso, Belén Pérez-Lancho, Ana Belén Gil González, Darío López Ramos
article en

Abstract

Where bioenergy plants can be supplied economically depends on the distribution and delivered cost of harvestable forest biomass, but regional estimates miss the fine-scale variation in availability, terrain and transport. This study develops a geospatial framework to assess annual forest biomass supply and identify cost-effective bioenergy plant locations in Castilla y León, Spain. Hectare-level aboveground biomass (AGB), predicted by machine learning from GEDI spaceborne lidar, Sentinel-1/2, terrain and canopy-height data ( R 2 = 0.70 on independent test blocks), distributes, rather than increases, official municipal estimates of annual stem-wood increment; slope, legal protection, recent fires and mobilisation scenarios determine the eligible supply. Delivered costs integrate handling, terrain-dependent forwarder extraction and road transport. Candidate locations are evaluated for five plant-demand classes by accumulating biomass in order of delivered cost. With 10% of the eligible increment mobilised (260 Gg yr −1 of dry mass), district-heating and small combined heat and power plants can be supplied at 57.6–64.4 € Mg −1 , of which location-independent handling accounts for 87%–98%, whereas 10–20 MW e power plants become feasible only when 30% is mobilised. AGB-based allocation shifts supply towards denser stands but leaves the preferred locations largely unchanged, and favourable locations form connected supply basins rather than isolated points. Diesel emissions from extraction and transport, 22–25 kg CO 2 e Mg −1 , vary little among locations. Plant feasibility depends strongly on the mobilisable share of annual increment, which must be distinguished from theoretical growth. The framework reproducibly links fine-scale biomass mapping with supply-cost assessment and bioenergy planning.

Biomass and BioenergyVol. 217
Universidad de Salamanca (ES), Instituto de Estudios de Ciencias de la Salud de Castilla y León (ES), Technological Institute of Castilla y León (ES)
European Commission, NextGenerationEU
Affordable and clean energy, Climate action
Forest Biomass Utilization and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon