Analysis of Molding Machine Efficiency Using the Overall Equipment Effectiveness (OEE) Method and Six Big Losses to Reduce Product Defects at PT. XYZ

This study aims to evaluate the performance efficiency of molding machines using the Overall Equipment Effectiveness (OEE) method and to identify the main causes of production losses through the Six Big Losses approach and a Fishbone Diagram. The data used consist of machine operational records from January to June 2025. The findings show that the average OEE score is 63.08%, below the company’s standard of 75%. The Six Big Losses analysis indicates that the largest losses are attributed to equipment failures, accounting for 63.45%, followed by reduced speed at 12.70% and idling and minor stoppages at 10.79%. In addition, the Fishbone analysis indicates that the main causes of low OEE are related to machine and personnel factors, including hydraulic system malfunctions, machine overheating, and extended setup times resulting from limitations in operator skills. The proposed improvements focus on implementing preventive maintenance, improving operator skills, and standardizing work procedures. Estimates suggest that these improvements could potentially increase the OEE value to 68.6%. The findings are expected to serve as a basis for improving machine effectiveness and production process efficiency.

Authors

Publication Details

Journal
Greenation International Journal of Engineering Science
Published
2026-11-16
DOI
https://doi.org/10.38035/gijes.v4i3.1293
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Analysis of Molding Machine Efficiency Using the Overall Equipment Effectiveness (OEE) Method and Six Big Losses to Reduce Product Defects at PT. XYZ

Hery Irwan, Trison Darius
Greenation International Journal of Engineering Science
Management and Optimization Techniques
article

Analysis of Molding Machine Efficiency Using the Overall Equipment Effectiveness (OEE) Method and Six Big Losses to Reduce Product Defects at PT. XYZ

Hery Irwan, Trison Darius
article en

Abstract

This study aims to evaluate the performance efficiency of molding machines using the Overall Equipment Effectiveness (OEE) method and to identify the main causes of production losses through the Six Big Losses approach and a Fishbone Diagram. The data used consist of machine operational records from January to June 2025. The findings show that the average OEE score is 63.08%, below the company’s standard of 75%. The Six Big Losses analysis indicates that the largest losses are attributed to equipment failures, accounting for 63.45%, followed by reduced speed at 12.70% and idling and minor stoppages at 10.79%. In addition, the Fishbone analysis indicates that the main causes of low OEE are related to machine and personnel factors, including hydraulic system malfunctions, machine overheating, and extended setup times resulting from limitations in operator skills. The proposed improvements focus on implementing preventive maintenance, improving operator skills, and standardizing work procedures. Estimates suggest that these improvements could potentially increase the OEE value to 68.6%. The findings are expected to serve as a basis for improving machine effectiveness and production process efficiency.

Greenation International Journal of Engineering ScienceVol. 4(3)
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon