Effect of Project Scheduling on Cost Overruns in Public Infrastructure Projects in Rwanda. A Case of Nyabisindu–Nyagatovu Road Upgrading Project

The purpose of this study is to assess the effect of project scheduling on cost overruns of Nyabisindu-Nyagatovu Road Upgrading Project.Descriptive and correlational research design was employed, utilizing both quantitative and qualitative approaches to gather comprehensive data.The target population consisted of 260 professionals involved in the project, from which a sample size of 155 respondents was selected using Krejcie and Morgan sample and stratified sampling.Data collection tools included documentation, structured questionnaires and interview guides, with analysis performed using SPSS Version 29.Descriptive statistics such as means and standard deviations was calculated, while inferential analysis, including multiple regression, tested the research hypotheses.Findings showed that communication scheduling had a significant effect on cost overruns of Nyabisindu-Nyagatovu Road Upgrading Project (β = 0.257, t = 5.039, p = 0.000), resource allocation had a significant effect on cost overruns (β = 0.285, t = 5.377, p = 0.000), coordination had a significant effect on cost overruns (β = 0.136, t = 2.720, p = 0.007), and evaluation scheduling had a significant effect on cost overruns (β = 0.282, t = 4.780, p = 0.000).The study concluded that project scheduling significantly influenced cost overruns of Nyabisindu-Nyagatovu Road Upgrading Project in Gasabo District.The study recommended that the management of Nyabisindu-Nyagatovu Road Upgrading Project should strengthen communication scheduling, resource allocation, coordination, and evaluation scheduling to improve cost control and reduce unnecessary cost increases.

Publication Details

Journal
Journal of Research Innovation and Implications in Education
Published
2026-11-17
DOI
https://doi.org/10.59765/fxw9g6
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Effect of Project Scheduling on Cost Overruns in Public Infrastructure Projects in Rwanda. A Case of Nyabisindu–Nyagatovu Road Upgrading Project

3 links
Journal of Research Innovation and Implications in Education
Construction Project Management and Performance
article

Effect of Project Scheduling on Cost Overruns in Public Infrastructure Projects in Rwanda. A Case of Nyabisindu–Nyagatovu Road Upgrading Project

article en

Abstract

The purpose of this study is to assess the effect of project scheduling on cost overruns of Nyabisindu-Nyagatovu Road Upgrading Project.Descriptive and correlational research design was employed, utilizing both quantitative and qualitative approaches to gather comprehensive data.The target population consisted of 260 professionals involved in the project, from which a sample size of 155 respondents was selected using Krejcie and Morgan sample and stratified sampling.Data collection tools included documentation, structured questionnaires and interview guides, with analysis performed using SPSS Version 29.Descriptive statistics such as means and standard deviations was calculated, while inferential analysis, including multiple regression, tested the research hypotheses.Findings showed that communication scheduling had a significant effect on cost overruns of Nyabisindu-Nyagatovu Road Upgrading Project (β = 0.257, t = 5.039, p = 0.000), resource allocation had a significant effect on cost overruns (β = 0.285, t = 5.377, p = 0.000), coordination had a significant effect on cost overruns (β = 0.136, t = 2.720, p = 0.007), and evaluation scheduling had a significant effect on cost overruns (β = 0.282, t = 4.780, p = 0.000).The study concluded that project scheduling significantly influenced cost overruns of Nyabisindu-Nyagatovu Road Upgrading Project in Gasabo District.The study recommended that the management of Nyabisindu-Nyagatovu Road Upgrading Project should strengthen communication scheduling, resource allocation, coordination, and evaluation scheduling to improve cost control and reduce unnecessary cost increases.

Journal of Research Innovation and Implications in Education
Industry, innovation and infrastructure
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon