Effect of Triple Constraint Management on Successful Implementation of Public Infrastructure Projects: A Case of Rubavu Modern Market, Rwanda

This study examined the effect of Triple Constraint Management on Successful Implementation of Public Infrastructure Projects, using Rubavu Modern Market in Rwanda as a case study.Specifically, the study attempted to examine the effect of project scope management on successful implementation of Public Infrastructure Projects a Case of Rubavu Modern Market, Rwanda.The study adopted a descriptive and correlational research design with a mixed-methods approach.The target population was 200 stakeholders, with a sample of 133 respondents.Of the 133 questionnaires distributed, 131 valid responses were obtained, while key informant interviews provided qualitative evidence.Data were analyzed using SPSS Version 27 through descriptive statistics, Pearson Product Moment Correlation, and regression analysis.The findings showed that project scope management practices were weak, with an overall mean of 1.14 (SD = 0.29).There was a strong positive and statistically significant relationship between project scope management and project implementation (r = .855,p < .001,N = 131).Regression analysis also showed a positive and statistically significant effect of project scope management (B = .270,β = .289,t = 5.039, p < .001).The null hypothesis was therefore rejected.The study concludes that effective project scope management contributes significantly to successful project implementation.It recommends clear scope definition, stakeholder participation, proper documentation and communication, and effective control of scope changes.

Publication Details

Journal
Journal of Research Innovation and Implications in Education
Published
2026-11-17
DOI
https://doi.org/10.59765/vhr8
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Effect of Triple Constraint Management on Successful Implementation of Public Infrastructure Projects: A Case of Rubavu Modern Market, Rwanda

3 links
Journal of Research Innovation and Implications in Education
Construction Project Management and Performance
article

Effect of Triple Constraint Management on Successful Implementation of Public Infrastructure Projects: A Case of Rubavu Modern Market, Rwanda

article en

Abstract

This study examined the effect of Triple Constraint Management on Successful Implementation of Public Infrastructure Projects, using Rubavu Modern Market in Rwanda as a case study.Specifically, the study attempted to examine the effect of project scope management on successful implementation of Public Infrastructure Projects a Case of Rubavu Modern Market, Rwanda.The study adopted a descriptive and correlational research design with a mixed-methods approach.The target population was 200 stakeholders, with a sample of 133 respondents.Of the 133 questionnaires distributed, 131 valid responses were obtained, while key informant interviews provided qualitative evidence.Data were analyzed using SPSS Version 27 through descriptive statistics, Pearson Product Moment Correlation, and regression analysis.The findings showed that project scope management practices were weak, with an overall mean of 1.14 (SD = 0.29).There was a strong positive and statistically significant relationship between project scope management and project implementation (r = .855,p < .001,N = 131).Regression analysis also showed a positive and statistically significant effect of project scope management (B = .270,β = .289,t = 5.039, p < .001).The null hypothesis was therefore rejected.The study concludes that effective project scope management contributes significantly to successful project implementation.It recommends clear scope definition, stakeholder participation, proper documentation and communication, and effective control of scope changes.

Journal of Research Innovation and Implications in Education
Industry, innovation and infrastructure, Sustainable cities and communities
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon