Techno-Economic and Security-Constrained Expansion Planning of the 132-kV Western Uganda Transmission Network

Background Rapid demand growth can expose developing transmission systems to corridor overload, voltage deterioration and contingency vulnerability before major reinforcement is completed. Methods We evaluated expansion of the 132-kV Western Uganda network using full AC power flow, multi-objective planning, N−1 contingency analysis, demand-growth stress testing and discounted economic assessment. Results At 184 MW and 75 MVAr base demand, the existing network lost 2.8767 MW and the Mutundwe–Kabulasoke corridor reached 131.67% loading. A two-circuit plan—Mbarara North–Masaka West and an additional Mutundwe–Kabulasoke circuit—costing USD 117.76 million reduced losses to 1.7261 MW, aggregate voltage deviation from 0.1908 to 0.0974 p.u., and maximum loading to 64.66%. Secure N−1 outcomes improved from 0/12 to 11/14, but two radial-islanding risks and one bulk-entry overload remained. The expanded network met voltage and thermal limits through 120% demand; thermal loading reached 111.7% at 130%. Loss-only discounted benefits produced negative net present value across the tested assumptions. Conclusions The results indicate that transmission reinforcement can improve technical performance and contingency security, while a complete investment appraisal also requires monetised reliability, resilience and transfer-capacity benefits.

Authors

Institutions

Publication Details

Journal
F1000Research
Published
2026-11-17
DOI
https://doi.org/10.12688/f1000research.193864.1
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Techno-Economic and Security-Constrained Expansion Planning of the 132-kV Western Uganda Transmission Network

Elnazeer Ali Hamid Abdalla, Val Hyginus Udoka Eze, Abdullahi Bala Kunya, Bubu Pius Erheyovwe et al.
F1000Research
Electric Power System Optimization
article

Techno-Economic and Security-Constrained Expansion Planning of the 132-kV Western Uganda Transmission Network

Elnazeer Ali Hamid Abdalla, Val Hyginus Udoka Eze, Abdullahi Bala Kunya, Bubu Pius Erheyovwe, Simon Mugisha, Asiimwe Julius
article en

Abstract

Background Rapid demand growth can expose developing transmission systems to corridor overload, voltage deterioration and contingency vulnerability before major reinforcement is completed. Methods We evaluated expansion of the 132-kV Western Uganda network using full AC power flow, multi-objective planning, N−1 contingency analysis, demand-growth stress testing and discounted economic assessment. Results At 184 MW and 75 MVAr base demand, the existing network lost 2.8767 MW and the Mutundwe–Kabulasoke corridor reached 131.67% loading. A two-circuit plan—Mbarara North–Masaka West and an additional Mutundwe–Kabulasoke circuit—costing USD 117.76 million reduced losses to 1.7261 MW, aggregate voltage deviation from 0.1908 to 0.0974 p.u., and maximum loading to 64.66%. Secure N−1 outcomes improved from 0/12 to 11/14, but two radial-islanding risks and one bulk-entry overload remained. The expanded network met voltage and thermal limits through 120% demand; thermal loading reached 111.7% at 130%. Loss-only discounted benefits produced negative net present value across the tested assumptions. Conclusions The results indicate that transmission reinforcement can improve technical performance and contingency security, while a complete investment appraisal also requires monetised reliability, resilience and transfer-capacity benefits.

F1000ResearchVol. 15
Ahmadu Bello University (NG), Mbarara University of Science and Technology (UG), Kampala International University (UG), Kabale University (UG)
Industry, innovation and infrastructure, Affordable and clean energy
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon