Ocena stanu technicznego transformatorów energetycznych po awaryjnym wyłączeniu – pomiary i rewizja wewnętrzna
Carrying out an internal inspection of a transformer, supplemented by a direct examination of the transformer or, at the very least, a review of the results of a previously conducted post-fault examination, always provides an excellent opportunity to verify the consistency between the diagnoses made on the basis of the tests carried out and the faults actually found. This paper presents a critical analysis of two such cases involving transformers with capacities of 40 MVA and 25 MVA. Good agreement was found between the measurements and the results of the inspection, although it was only the latter that enabled the details of the defect and its location to be determined.
Authors
- Ryszard Kozak
Publication Details
- Journal
- WIADOMOŚCI ELEKTROTECHNICZNE
- Published
- 2026-11-17
- DOI
- https://doi.org/10.15199/74.2026.11.3
- Primary Topic
- Power Transformer Diagnostics and Insulation
- Type
- article
- Field-Weighted Citation Impact
- 0.00