Success Factors for Implementing Cloud-Based Construction Management Software (CBCMS) in Malaysia’s Construction Projects
Cloud-Based Construction Management Software (CBCMS) supports construction project management through centralised data management, real-time collaboration and improved project transparency. This study aimed to identify the key success factors for CBCMS implementation in Malaysian construction projects and to evaluate practitioners' perceptions of the importance of these factors for effective implementation. A quantitative cross-sectional survey was conducted using a structured questionnaire comprising 30 five-point Likert-scale items across six literature-derived criteria. The instrument was content-validated by three academic experts and pilot-tested with 30 respondents. Empirical responses from 130 practitioners, purposively sampled from G7 contractor companies registered with the Construction Industry Development Board (CIDB) Malaysia, were analysed using mean scores, Relative Importance Index (RII), item-rest correlations, Cronbach's alpha, Repeated-Measures ANOVA, Exploratory Factor Analysis (EFA), Confirmatory Factor Analysis (CFA) and multiple linear regression in Jamovi. All six criteria exhibited high internal consistency (α = 0.896–0.916) and high levels of practitioner agreement (means = 4.26–4.32; RII = 0.851–0.865). Functionality was ranked highest (mean = 4.32, RII = 0.865), with integration with Building Information Modelling (BIM) and other software being its highest-rated item (mean = 4.38), followed by project performance impact (mean = 4.30, RII = 0.859). EFA and CFA showed that the items loaded strongly on their constructs (CR = 0.896–0.915; AVE = 0.632–0.684), but the six criteria were highly intercorrelated (HTMT up to 0.994), indicating related dimensions of one overall construct. Repeated-Measures ANOVA indicated that differences among criteria means were not statistically significant (F = 1.117, p = 0.348). Furthermore, multiple linear regression (R² = 0.884, p < 0.001) showed that functionality, usability, data management and security, and organisational support were significantly and positively associated with perceived project performance impact. These findings, which reflect predominantly large-contractor perspectives, provide practical guidance for contracting organisations modernising digital construction workflows in Malaysia.
Authors
- Ragil Purnamasari
- Rashidah Lip (ORCID: https://orcid.org/0000-0002-1417-2263)
- Mohd Kamaruzaman Musa
- Siti Nurul Izzah Mohd Sah Roni
- Md Fadli Abdullah
- Darshinii A. Sivasanmugam
Institutions
- Sepuluh Nopember Institute of Technology (ID)
- Newcastle University Medicine Malaysia (MY)
- Politeknik Tun Syed Nasir Syed Ismail (MY)
- Tun Hussein Onn University of Malaysia (MY)
Publication Details
- Journal
- International Journal of Research and Innovation in Social Science
- Published
- 2026-11-17
- DOI
- https://doi.org/10.47772/ijriss.2026.101000750
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- Universiti Tun Hussein Onn Malaysia