Experimental Characterization of Critical Connections in an Offshore Floating Photovoltaic System
Mechanical connections govern load transfer, flexibility and survivability in modular offshore floating photovoltaic systems. This study experimentally characterised three connection systems: polyurethane hinges between adjacent photovoltaic modules, steel-wire-rope assemblies between floating-breakwater units, and flexible transition connections between the breakwater and the photovoltaic array. Polyurethane specimens and complete hinges were tested under tensile, compressive, shear and torsional loading. The wire-rope and transition assemblies were tested under monotonic quasi-static tension to failure.The polyurethane showed nonlinear elastomeric behaviour and high deformation capacity. Complete hinges reached a mean ultimate tensile load of 3.69 kN, while global buckling occurred at comparatively low compressive loads, identifying geometric stability as a critical design limitation. The shear and torsion tests provided stiffness and large-deformation data but were not continued to failure. The steel-wire-rope assemblies reached a mean ultimate load of 402 kN, with four of five failures governed by the terminations rather than the wire body. Five valid breakwater-to-module connection tests produced a mean ultimate load of 40.88 kN, approximately 2.7% below the 42 kN design requirement. Protection of the bracket-rope interface reduced local abrasion, and the final two specimens reached 43.7 and 42.9 kN, respectively.The results provide experimentally derived, direction-dependent stiffness data and identify the governing failure mechanisms of the complete connection assemblies. The findings demonstrate that nominal material or component capacities alone are insufficient for connection qualification because geometry, terminations and contact interfaces can govern performance. The polyurethane hinge requires redesign to improve tensile capacity and compression stability, while the wire-rope terminations and breakwater-to-module interface require further optimisation. Fatigue testing, marine ageing, combined-load assessment and testing with the final installed fixtures are required before offshore qualification.
Authors
- Virgile Delhaye
- Balram Panjwani (ORCID: https://orcid.org/0000-0002-9700-2672)
Publication Details
- Journal
- Preprints.org
- Published
- 2026-11-17
- DOI
- https://doi.org/10.20944/preprints202611.1612.v1
- Primary Topic
- Offshore Engineering and Technologies
- Type
- preprint