Toward Sustainable Smart Manufacturing under Maritime Disruptions: Timing-Aware Optimization and State Feedback
Abstract Maritime disruptions threaten manufacturing when materials become usable after production deadlines or when recovery capacity is exhausted. This study develops and evaluates a timing-aware decision-support framework linking inbound bookings, protective inventory, reserved transport capacity and feasible production. Matched comparisons distinguish the value of state-responsive replanning, residual protection and production coordination. Ten policies are evaluated on 120 matched ten-week computational episodes, supplemented by 216 factorial and 24 multi-size episodes. Rolling updates reduce mean cost by 19.47% relative to retaining the initial plan; residual protection reduces cost by 3.53% relative to nominal planning. Advantages over persistence and production-first planning remain small and uncertain. A separate 26-week, author-confirmed empirical factory ledger records 22.87% on-time dispatch despite 95.34% fulfilment by cutoff and 96.49% regular-hour utilization. An analytical circularity extension links qualified secondary inputs, delayed recovery, carried work in progress and shared production capacity to physically supported customer dispatch and explicit environmental budgets. A worked example shows that maximizing recovery volume can reduce feasible finished output. The contribution is a decision-structure and evaluation framework, not a new learning algorithm. The findings support deadline-feasible resource decisions; environmental benefits and broader transferability require further comparative evaluation.
Authors
- El-Nakib Islam
Institutions
- Arab Academy for Science, Technology, and Maritime Transport (EG)
Publication Details
- Journal
- Research Square
- Published
- 2026-11-17
- DOI
- https://doi.org/10.21203/rs.3.rs-11317187/v1
- Primary Topic
- Supply Chain Resilience and Risk Management
- Type
- preprint