Reducing Manufacturing Waste in the Copper Industry through Lean Six Sigma and Value Stream Mapping: An Industrial Case Study in Malaysia

Continuous copper rod manufacturing is highly sensitive to upstream process instability, yet Lean Six Sigma research has rarely examined continuous metallurgical processes. This study evaluates the effectiveness of Value Stream Mapping (VSM) in reducing waste and enhancing operational performance in the upstream Continuous Casting and Rolling (CCR) process of a Malaysian copper manufacturer. An industrial case study was conducted using VSM as the primary analytical tool, supported by the Define, Measure, Analyse, Improve and Control (DMAIC) framework. SAP production records, including coil-by-coil rod reports, were cross-validated against SCADA data and shop-floor observations to map the current state, quantify value-added time, prioritise defects using Pareto and Ishikawa analyses, and evaluate Overall Equipment Effectiveness (OEE). Five targeted Kaizen interventions were implemented across the Loader, Melting Furnace, Casting Wheel, Rolling Mill and Coiler workstations. A comparison between the baseline (Week 10, 718 coils) and post-improvement (Week 41, 673 coils) periods revealed a statistically significant 17% relative reduction in the copper rod downgrade rate (31.34% to 26.00%; p = 0.028), alongside an increase in OEE from 63.49% to 67.58%, primarily driven by improved quality performance. The Future State VSM projected a 40% reduction in production process lead time, from 32.02 to 19.21 hours. Chemical-impurity downgrades decreased from 16.7% to 3.0% following material verification at the Loader, while pallet-related defects were eliminated at the Coiler. However, oxygen-, surface- and peeling-related defects increased. Based on copper prices and exchange rates matched to the respective assessment dates, the estimated 139.9 tonnes of weekly downgrades avoided represent an economic benefit of RM 0.15–0.30 million, after accounting for market price fluctuations. Given the single-site design, longer-term performance monitoring and multi-site validation are recommended.

Authors

Institutions

Publication Details

Journal
International Journal of Research and Innovation in Social Science
Published
2026-11-17
DOI
https://doi.org/10.47772/ijriss.2026.101000749
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Reducing Manufacturing Waste in the Copper Industry through Lean Six Sigma and Value Stream Mapping: An Industrial Case Study in Malaysia

Nor Hayati Saad, Isnaiddy Dalisan, Muhammad Khairul Rezwan Abdul Rahman
International Journal of Research and Innovation in Social Science
Quality and Supply Management
article

Reducing Manufacturing Waste in the Copper Industry through Lean Six Sigma and Value Stream Mapping: An Industrial Case Study in Malaysia

Nor Hayati Saad, Isnaiddy Dalisan, Muhammad Khairul Rezwan Abdul Rahman
article en

Abstract

Continuous copper rod manufacturing is highly sensitive to upstream process instability, yet Lean Six Sigma research has rarely examined continuous metallurgical processes. This study evaluates the effectiveness of Value Stream Mapping (VSM) in reducing waste and enhancing operational performance in the upstream Continuous Casting and Rolling (CCR) process of a Malaysian copper manufacturer. An industrial case study was conducted using VSM as the primary analytical tool, supported by the Define, Measure, Analyse, Improve and Control (DMAIC) framework. SAP production records, including coil-by-coil rod reports, were cross-validated against SCADA data and shop-floor observations to map the current state, quantify value-added time, prioritise defects using Pareto and Ishikawa analyses, and evaluate Overall Equipment Effectiveness (OEE). Five targeted Kaizen interventions were implemented across the Loader, Melting Furnace, Casting Wheel, Rolling Mill and Coiler workstations. A comparison between the baseline (Week 10, 718 coils) and post-improvement (Week 41, 673 coils) periods revealed a statistically significant 17% relative reduction in the copper rod downgrade rate (31.34% to 26.00%; p = 0.028), alongside an increase in OEE from 63.49% to 67.58%, primarily driven by improved quality performance. The Future State VSM projected a 40% reduction in production process lead time, from 32.02 to 19.21 hours. Chemical-impurity downgrades decreased from 16.7% to 3.0% following material verification at the Loader, while pallet-related defects were eliminated at the Coiler. However, oxygen-, surface- and peeling-related defects increased. Based on copper prices and exchange rates matched to the respective assessment dates, the estimated 139.9 tonnes of weekly downgrades avoided represent an economic benefit of RM 0.15–0.30 million, after accounting for market price fluctuations. Given the single-site design, longer-term performance monitoring and multi-site validation are recommended.

International Journal of Research and Innovation in Social ScienceVol. 10(10)
Universiti Teknologi MARA System (MY), Universiti Teknologi MARA (MY)
Universiti Teknologi MARA
Responsible consumption and production, Industry, innovation and infrastructure
Quality and Supply Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon