The Fiscal Cost of Energy Insecurity: Import Expenditure versus Forgone Export Revenue after the 2026 Bhote Koshi Disaster in Nepal

On 26 August 2026 a glacial-origin debris flood on the Bhote Koshi River removed about 432 MW of capacity from Nepal’s Trishuli corridor, destroyed its 220 kV evacuation hub and delayed a further 495 MW under construction, weeks after the country’s largest electricity trade surplus. This paper quantifies the fiscal cost in two ledgers built from plant-level generation and revenue records. The first values forgone generation over each plant’s repair or outage period: 14,274 GWh, worth USD 988 million at the Nepal Electricity Authority’s average domestic sales realisation, comprising a net USD 581 million to the utility and USD 407 million in producers’ contracted revenue. The annual loss begins at 4,469 GWh (USD 309 million) and reaches zero only in the fifth year. The second traces the cross-border trade account over the first year: a net cost to the utility of NPR 8.39 billion (USD 60 million; range NPR 6.98–12.27 billion), or 44 per cent of the FY 2082/83 trade surplus. The loss arrives first as forgone exports and shifts from mid-December to dry-season imports priced some 54 per cent above the forgone export realisation. Capacity stranded by transmission loss alone accounts for 41 per cent of the energy lost in the first six months, so much of the near-term loss is recoverable through transmission reconstruction without rebuilding powerhouses. The findings support prioritising the Trishuli 3B Hub reconnection, transmission redundancy in cascade corridors, storage-backed export contracts, a fixed-price emergency import tranche and parametric insurance against hydropower flow losses.

Authors

Institutions

Publication Details

Journal
Engineering Archive (engrXiv)
Published
2026-11-17
DOI
https://doi.org/10.31224/8832
Primary Topic
Global Energy Security and Policy
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

The Fiscal Cost of Energy Insecurity: Import Expenditure versus Forgone Export Revenue after the 2026 Bhote Koshi Disaster in Nepal

Puja Kharel, Aashish Katuwal
Engineering Archive (engrXiv)
Global Energy Security and Policy
preprint

The Fiscal Cost of Energy Insecurity: Import Expenditure versus Forgone Export Revenue after the 2026 Bhote Koshi Disaster in Nepal

Puja Kharel, Aashish Katuwal
preprint en

Abstract

On 26 August 2026 a glacial-origin debris flood on the Bhote Koshi River removed about 432 MW of capacity from Nepal’s Trishuli corridor, destroyed its 220 kV evacuation hub and delayed a further 495 MW under construction, weeks after the country’s largest electricity trade surplus. This paper quantifies the fiscal cost in two ledgers built from plant-level generation and revenue records. The first values forgone generation over each plant’s repair or outage period: 14,274 GWh, worth USD 988 million at the Nepal Electricity Authority’s average domestic sales realisation, comprising a net USD 581 million to the utility and USD 407 million in producers’ contracted revenue. The annual loss begins at 4,469 GWh (USD 309 million) and reaches zero only in the fifth year. The second traces the cross-border trade account over the first year: a net cost to the utility of NPR 8.39 billion (USD 60 million; range NPR 6.98–12.27 billion), or 44 per cent of the FY 2082/83 trade surplus. The loss arrives first as forgone exports and shifts from mid-December to dry-season imports priced some 54 per cent above the forgone export realisation. Capacity stranded by transmission loss alone accounts for 41 per cent of the energy lost in the first six months, so much of the near-term loss is recoverable through transmission reconstruction without rebuilding powerhouses. The findings support prioritising the Trishuli 3B Hub reconnection, transmission redundancy in cascade corridors, storage-backed export contracts, a fixed-price emergency import tranche and parametric insurance against hydropower flow losses.

Engineering Archive (engrXiv)
Pokhara University (NP), Institute of Engineering (NP), Pulchowk Campus (NP)
Affordable and clean energy, Industry, innovation and infrastructure, Climate action
Global Energy Security and Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon