Onshore Wind Turbine Maintenance Strategies: A Structured Review and a Reproducible Monte Carlo Assessment of Reliability, Availability, and Lifecycle Costs
Effective maintenance management is essential for the reliability, availability and economic performance of onshore wind turbines. This study combines a structured review of corrective, preventive, condition-based (CBM), predictive (PdM) and opportunistic maintenance with a reproducible Monte Carlo assessment. The review covers strategy definitions, SCADA data quality and availability, scheduling models, onsite operations and environmental boundaries, and a 105-entry alarm-level fault catalogue covering 14 subsystems is coded to separate component failures from instrumentation faults, protective trips and operating restrictions. The checklist derived from the review parameterizes an event-driven simulation of a hypothetical 120 MW farm over 25 years in temperate, mountainous, coastal and desert environments, including spare-part inventory, crane lead times, crew dispatch and continuous weather windows. The model is calibrated to a field failure frequency of 1.8 failures per turbine-year and benchmarked against published reliability statistics; 100 paired replications give confidence intervals below EUR 0.06/MWh on strategy differences. For an identical wind resource, the preventive-maintenance LCOE ranges from EUR 53.23/MWh (temperate) to EUR 55.18/MWh (mountainous). Relative to preventive maintenance, CBM and PdM increase energy-based availability by 0.25–0.30 and 0.84–1.29 percentage points and reduce outage time by 14–19% and 45–47%, but under the assumed digital costs neither lowers LCOE. The admissible annualized digital cost is EUR 0.10–0.15 million/year for CBM and EUR 0.54–0.72 million/year for PdM, i.e., 71–80% and 39–54% below the assumed costs. About three quarters of the PdM advantage stems from the assumed warning time and detection performance rather than from predictive scheduling; class imbalance and domain shift of diagnostic models reduce it, higher spare-part and crane prices increase it, and longer supply-chain lead times reduce it because warnings shorter than the procurement time cannot be acted upon. The results are comparative, scenario-based estimates intended to guide digital-monitoring investment rather than predictions for a specific farm.
Authors
- Najib El Ouanjli (ORCID: https://orcid.org/0000-0001-7775-7747)
- Hassna Salime (ORCID: https://orcid.org/0000-0001-5099-4574)
- Mohamed Bousla (ORCID: https://orcid.org/0000-0003-1298-8258)
- Hilal Essaouini (ORCID: https://orcid.org/0000-0001-7941-5775)
- Youness El Mourabit (ORCID: https://orcid.org/0000-0002-5237-9468)
- Ali Haddi (ORCID: https://orcid.org/0000-0001-5521-9382)
- Thabet M. Alzahrani (ORCID: https://orcid.org/0009-0009-9607-1922)
- Saud Alotaibi (ORCID: https://orcid.org/0000-0003-4003-219X)
- Badre Bossoufi (ORCID: https://orcid.org/0009-0009-6506-8464)
Institutions
- Shaqra University (SA)
- Abdelmalek Essaâdi University (MA)
- Université Moulay Ismail de Meknes (MA)
- Sidi Mohamed Ben Abdellah University (MA)
Publication Details
- Journal
- Energies
- Published
- 2026-11-16
- DOI
- https://doi.org/10.3390/en19225537
- Primary Topic
- Reliability and Maintenance Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00