Effect of Risk Management Practices on Performance of Digital Transformation Projects: A Case of Network Modernization Project at MTN Rwanda

The general objective of this study was to assess the effect of risk management practices on the performance of digital transformation projects in Rwanda, with specific reference to the Network Modernization Project at MTN Rwanda.Data analysis was conducted using Statistical Package for Social Sciences (SPSS) version 29 to generate descriptive and inferential statistics.The findings showed that the R-squared value of 0.772 denotes that approximately 77.2% of the variation in project performance can be explained by the three risk management practices.The Durbin-Watson statistic of 1.692 suggests no significant autocorrelation in the residuals.The overall model significance is confirmed, as the significance level is below 0.05.The unstandardized coefficient for the constant is 0.182, representing the baseline level of project performance when all predictor variables are zero.Risk identification has a coefficient of 0.201, indicating that a one-unit increase in risk identification leads to a 0.201-unit increase in project performance (beta = 0.217, t = 3.865, p = 0.000).Risk analysis has a coefficient of 0.548, suggesting that a one-unit increase enhances project performance by 0.548 units (beta = 0.522, t = 10.340,p = 0.000).Risk monitoring and control has a coefficient of 0.220, indicating that a one-unit improvement increases project performance by 0.220 units (beta = 0.255, t = 4.074, p = 0.000).The study recommended that the MTN Rwanda management link risk management performance metrics directly to overall evaluations.

Publication Details

Journal
Journal of Research Innovation and Implications in Education
Published
2026-11-17
DOI
https://doi.org/10.59765/ncy
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Effect of Risk Management Practices on Performance of Digital Transformation Projects: A Case of Network Modernization Project at MTN Rwanda

10 links
Journal of Research Innovation and Implications in Education
Construction Project Management and Performance
article

Effect of Risk Management Practices on Performance of Digital Transformation Projects: A Case of Network Modernization Project at MTN Rwanda

article en

Abstract

The general objective of this study was to assess the effect of risk management practices on the performance of digital transformation projects in Rwanda, with specific reference to the Network Modernization Project at MTN Rwanda.Data analysis was conducted using Statistical Package for Social Sciences (SPSS) version 29 to generate descriptive and inferential statistics.The findings showed that the R-squared value of 0.772 denotes that approximately 77.2% of the variation in project performance can be explained by the three risk management practices.The Durbin-Watson statistic of 1.692 suggests no significant autocorrelation in the residuals.The overall model significance is confirmed, as the significance level is below 0.05.The unstandardized coefficient for the constant is 0.182, representing the baseline level of project performance when all predictor variables are zero.Risk identification has a coefficient of 0.201, indicating that a one-unit increase in risk identification leads to a 0.201-unit increase in project performance (beta = 0.217, t = 3.865, p = 0.000).Risk analysis has a coefficient of 0.548, suggesting that a one-unit increase enhances project performance by 0.548 units (beta = 0.522, t = 10.340,p = 0.000).Risk monitoring and control has a coefficient of 0.220, indicating that a one-unit improvement increases project performance by 0.220 units (beta = 0.255, t = 4.074, p = 0.000).The study recommended that the MTN Rwanda management link risk management performance metrics directly to overall evaluations.

Journal of Research Innovation and Implications in Education
Industry, innovation and infrastructure
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon