Information management under BS EN ISO 19650-2: A cross-case analysis of implementation conditions in UK construction projects

Information management (IM) under BS EN ISO 19650-2 has become central to digital transformation in the UK construction industry. Despite its structured framework, implementation in practice remains inconsistent, with organisations interpreting and applying the standard in divergent ways. Existing research has focused on organisational and technological adoption, with limited attention to how IM is enacted within project delivery structures. In particular, the interaction between procurement routes, appointment arrangements, IM resources and Common Data Environment (CDE) practices remains underexplored. This study addresses this gap through a multiple embedded case study of four UK projects procured through Design–Bid–Build and Design and Build routes. Document analysis, interviews and clause-level assessment were used to examine how IM is configured and enacted across delivery and appointment structures, focusing on IM resources and CDE workflows at the lead appointed party level. Cross-case synthesis identified structural and operational conditions combined within four case-derived implementation configurations: fragmented early-stage, integrated delivery, centralised coordination and transitional governance. Variations in governance continuity and stability, coordination authority, appointment sequencing, IM resource formalisation and integration, IM structuring control, and CDE workflow structuring were associated with differences in how IM processes were organised, coordinated and controlled across the cases. The study provides a UK-based cross-case empirical analysis of BS EN ISO 19650-2, positioning implementation as a condition-dependent socio-technical process characterised by the interaction of structural and operational conditions rather than a uniform procedural model. The findings highlight the importance of alignment among procurement and appointment structures, IM resource integration and CDE workflows for consistent IM implementation.

Authors

Institutions

Publication Details

Journal
Journal of Information Technology in Construction
Published
2026-11-17
DOI
https://doi.org/10.36680/j.itcon.2026.057
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Information management under BS EN ISO 19650-2: A cross-case analysis of implementation conditions in UK construction projects

Nicoleta Panagiotidou, Michael Pitt, Qiuchen Lu, Sarah Davidson
3 links
Journal of Information Technology in Construction
BIM and Construction Integration
article

Information management under BS EN ISO 19650-2: A cross-case analysis of implementation conditions in UK construction projects

Nicoleta Panagiotidou, Michael Pitt, Qiuchen Lu, Sarah Davidson
article en

Abstract

Information management (IM) under BS EN ISO 19650-2 has become central to digital transformation in the UK construction industry. Despite its structured framework, implementation in practice remains inconsistent, with organisations interpreting and applying the standard in divergent ways. Existing research has focused on organisational and technological adoption, with limited attention to how IM is enacted within project delivery structures. In particular, the interaction between procurement routes, appointment arrangements, IM resources and Common Data Environment (CDE) practices remains underexplored. This study addresses this gap through a multiple embedded case study of four UK projects procured through Design–Bid–Build and Design and Build routes. Document analysis, interviews and clause-level assessment were used to examine how IM is configured and enacted across delivery and appointment structures, focusing on IM resources and CDE workflows at the lead appointed party level. Cross-case synthesis identified structural and operational conditions combined within four case-derived implementation configurations: fragmented early-stage, integrated delivery, centralised coordination and transitional governance. Variations in governance continuity and stability, coordination authority, appointment sequencing, IM resource formalisation and integration, IM structuring control, and CDE workflow structuring were associated with differences in how IM processes were organised, coordinated and controlled across the cases. The study provides a UK-based cross-case empirical analysis of BS EN ISO 19650-2, positioning implementation as a condition-dependent socio-technical process characterised by the interaction of structural and operational conditions rather than a uniform procedural model. The findings highlight the importance of alignment among procurement and appointment structures, IM resource integration and CDE workflows for consistent IM implementation.

Journal of Information Technology in ConstructionVol. 31
University of Nottingham (GB), University College London (GB)
Industry, innovation and infrastructure
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon