Spatial patterns of hybrid PV–CSP–TES configurations for green hydrogen production across Algeria

Existing studies have optimized hybrid PV–CSP plants or mapped suitable locations for solar hydrogen production, but the spatial dependence of the optimal hybrid architecture remains insufficiently resolved. This study develops a national-scale framework that couples GIS–FAHP screening with hourly PV–CSP–TES–electrolyzer simulation and site-specific NSGA-II optimization to determine how the cost-optimal system design changes across Algeria. At each meteorological location, PV capacity, CSP power-block capacity, TES duration, and solar multiple are jointly optimized for a fixed 50 MW electrolyzer, with the final configuration selected as the lowest levelized cost of hydrogen (LCOH) solution satisfying annual demand satisfaction (ADS) ≥ 90%. The resulting architecture varies substantially across the country: optimal PV capacity ranges from 70.03 to 168.86 MW, CSP power-block capacity from 50.00 to 92.98 MW, and solar multiple from 2.35 to 3.40, while annual hydrogen production remains comparatively stable at 7.58–7.65 kt H₂ yr −1 . Unconstrained LCOH ranges from 6.00 to 10.78 € kg −1 H₂ and narrows considerably after GIS-based deployment constraints are imposed. At Hassi R'Mel, the selected architecture combines approximately 100 MW PV, 50 MW CSP, SM = 2.80, and 16 h TES, achieving an LCOH of 6.53 € kg −1 H₂, 90.3% ADS and approximately 7.6 kt H₂ yr −1 . Sensitivity analysis identifies the discount rate and CSP capital cost as the strongest economic influences within the examined parameter ranges. A matched-output comparison shows that PV-only production can achieve lower LCOH when intermittency is acceptable, whereas PV–CSP–TES substantially increases electrolyzer utilization and production continuity. The results demonstrate that site-specific optimization is necessary to capture how economically preferred generation capacities and solar-field sizing adapt to local solar-resource conditions.

Authors

Institutions

Publication Details

Journal
Applied Energy
Published
2026-11-17
DOI
https://doi.org/10.1016/j.apenergy.2026.129285
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Spatial patterns of hybrid PV–CSP–TES configurations for green hydrogen production across Algeria

Farid Melgani, Mawloud Guermoui, Abdelfetah Belaid
5 links
Applied Energy
Hybrid Renewable Energy Systems
article

Spatial patterns of hybrid PV–CSP–TES configurations for green hydrogen production across Algeria

Farid Melgani, Mawloud Guermoui, Abdelfetah Belaid
article en

Abstract

Existing studies have optimized hybrid PV–CSP plants or mapped suitable locations for solar hydrogen production, but the spatial dependence of the optimal hybrid architecture remains insufficiently resolved. This study develops a national-scale framework that couples GIS–FAHP screening with hourly PV–CSP–TES–electrolyzer simulation and site-specific NSGA-II optimization to determine how the cost-optimal system design changes across Algeria. At each meteorological location, PV capacity, CSP power-block capacity, TES duration, and solar multiple are jointly optimized for a fixed 50 MW electrolyzer, with the final configuration selected as the lowest levelized cost of hydrogen (LCOH) solution satisfying annual demand satisfaction (ADS) ≥ 90%. The resulting architecture varies substantially across the country: optimal PV capacity ranges from 70.03 to 168.86 MW, CSP power-block capacity from 50.00 to 92.98 MW, and solar multiple from 2.35 to 3.40, while annual hydrogen production remains comparatively stable at 7.58–7.65 kt H₂ yr −1 . Unconstrained LCOH ranges from 6.00 to 10.78 € kg −1 H₂ and narrows considerably after GIS-based deployment constraints are imposed. At Hassi R'Mel, the selected architecture combines approximately 100 MW PV, 50 MW CSP, SM = 2.80, and 16 h TES, achieving an LCOH of 6.53 € kg −1 H₂, 90.3% ADS and approximately 7.6 kt H₂ yr −1 . Sensitivity analysis identifies the discount rate and CSP capital cost as the strongest economic influences within the examined parameter ranges. A matched-output comparison shows that PV-only production can achieve lower LCOH when intermittency is acceptable, whereas PV–CSP–TES substantially increases electrolyzer utilization and production continuity. The results demonstrate that site-specific optimization is necessary to capture how economically preferred generation capacities and solar-field sizing adapt to local solar-resource conditions.

Applied EnergyVol. 428
University of Trento (IT), Renewable Energy Development Center (DZ)
European Commission
Affordable and clean energy, Industry, innovation and infrastructure, Climate action
Hybrid Renewable Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon