Problems Facing Consultant Engineers and Integrated Solutions for Improved Project Performance in the Nigerian Construction Industry: A Survey of Professionals in Ibadan

Consultant engineers are central to the delivery of construction projects, yet project failures in Nigeria are frequently linked to deficiencies in design, supervision and professional conduct. Existing studies have largely examined these deficiencies in isolation. This study assessed fifteen consultant-related problems in terms of frequency and severity, examined their perceived effect on project cost, time, quality and safety, and evaluated fifteen technological, managerial and regulatory solutions among professionals who work with consultant engineers in Ibadan, Nigeria. A descriptive cross-sectional survey was conducted using a structured questionnaire (Cronbach’s alpha = 0.86 in the pilot study) administered to 60 professionals with at least five years of field experience, comprising consultant engineers (n = 22), contractor site engineers (n = 17), client project managers (n = 17) and other professionals (n = 4). Data were analysed using descriptive statistics, the Relative Importance Index (RII), a one-sample t-test and Friedman tests. Respondents rated the problems as low in frequency (overall mean = 2.22 out of 5) but high in severity (overall mean = 4.08). Inadequate geotechnical investigation was the most frequently reported problem (mean = 2.42), whereas lack of specialised building services expertise was the most severe (mean = 4.23). Respondents agreed strongly that these problems affect project performance (mean agreement = 4.27), and all fifteen solutions were strongly endorsed; however, the ranking items did not produce a valid priority order, and no significant differences were found within solution groups (Friedman test, p > 0.05). The findings indicate that consultant-related problems, although perceived as infrequent, carry serious consequences for project performance, and that technological, managerial and regulatory measures are supported as complementary remedies. The conclusions are limited by a small purposive sample drawn from one city and by the reliance on perception-based data.

Authors

Institutions

Publication Details

Journal
Iconic Research and Engineering Journals
Published
2026-11-17
DOI
https://doi.org/10.64388/ire1725194
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Problems Facing Consultant Engineers and Integrated Solutions for Improved Project Performance in the Nigerian Construction Industry: A Survey of Professionals in Ibadan

Sunday Olufemi Adesogan, Taiwo Zainab Busari
Iconic Research and Engineering Journals
Construction Project Management and Performance
article

Problems Facing Consultant Engineers and Integrated Solutions for Improved Project Performance in the Nigerian Construction Industry: A Survey of Professionals in Ibadan

Sunday Olufemi Adesogan, Taiwo Zainab Busari
article en

Abstract

Consultant engineers are central to the delivery of construction projects, yet project failures in Nigeria are frequently linked to deficiencies in design, supervision and professional conduct. Existing studies have largely examined these deficiencies in isolation. This study assessed fifteen consultant-related problems in terms of frequency and severity, examined their perceived effect on project cost, time, quality and safety, and evaluated fifteen technological, managerial and regulatory solutions among professionals who work with consultant engineers in Ibadan, Nigeria. A descriptive cross-sectional survey was conducted using a structured questionnaire (Cronbach’s alpha = 0.86 in the pilot study) administered to 60 professionals with at least five years of field experience, comprising consultant engineers (n = 22), contractor site engineers (n = 17), client project managers (n = 17) and other professionals (n = 4). Data were analysed using descriptive statistics, the Relative Importance Index (RII), a one-sample t-test and Friedman tests. Respondents rated the problems as low in frequency (overall mean = 2.22 out of 5) but high in severity (overall mean = 4.08). Inadequate geotechnical investigation was the most frequently reported problem (mean = 2.42), whereas lack of specialised building services expertise was the most severe (mean = 4.23). Respondents agreed strongly that these problems affect project performance (mean agreement = 4.27), and all fifteen solutions were strongly endorsed; however, the ranking items did not produce a valid priority order, and no significant differences were found within solution groups (Friedman test, p > 0.05). The findings indicate that consultant-related problems, although perceived as infrequent, carry serious consequences for project performance, and that technological, managerial and regulatory measures are supported as complementary remedies. The conclusions are limited by a small purposive sample drawn from one city and by the reliance on perception-based data.

Iconic Research and Engineering JournalsVol. 10(5)
University of Ibadan (NG)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon