Assessment of Value Engineering as A Strategic Tool for Cost Optimisation in Construction Project Delivery: A Case Study of a Two-Storey Commercial Complex
Architects and other professionals in the architecture, engineering, and construction industries encounter numerous problems related to on-time and on-budget project delivery. Project failure and delays in developing countries such as Nigeria result from inefficient use and disposal of construction resources and materials, design deficiencies, and inadequate communication and coordination among project team members. This paper presents and evaluates a framework integrating 5D BIM and the Value Engineering Job Plan process to enhance value and reduce costs and time and improve communication and coordination during all phases of a project's life cycle. A mixed-method research design was used to conduct a quantitative survey of built environment professionals in Oyo State, Nigeria (N = 43 out of 50 completed survey questionnaires distributed, an 86.00% response rate), and a quantitative 5D BIM-VE case study of the completed Two-Storey Multipurpose Commercial Complex project (1,770 m²) on Secretariat-University College Hospital (UCH) Road in Ibadan, Nigeria. Survey methods included mean item rating and relative importance indexes. Orion BIM software data were analyzed at various stages of the VE Job Plan process (including Information, Function Analysis, Creativity, Evaluation, Development, and Proposal) related to the case project. Empirical studies show that individual professionals are generally knowledgeable about VE (mean knowledge index = 3.930, RII = 0.786) but that VE is underutilized by organizations due to a lack of VE skills in the organization (mean institutionalization index = 2.930, RII = 0.586) and other cultural factors inhibiting VE adoption (RII = 0.809). The key factors promoting VE adoption are management support (RII = 0.865) and VE skills (RII = 0.851). Case studies indicate that the major cost components for a project included Sub- and Superstructures (30.00%; ₦56,556,960), Doors, Windows, Wall Cladding, and Cutting Walls (28.00%; ₦52,786,496), and MEP (20.00%; ₦37,704,640). Floor slabs accounted for 49.37% (255.259 m³) of the total structural concrete volume of 516.998 m³. Replacing solid slabs and 225 mm sandcrete blocks with waffle or ribbed slabs and 150 mm lightweight blocks and replacing standard glazing with composite glass-aluminium curtain walling raised the weighted criteria score from 85 to 87 points and reduced the project cost from ₦188,523,200 to ₦161,140,300, a savings of ₦26,828,646, or 14.30% of the initial construction cost and up to 15.00% of total lifecycle costs, and saved 15% of the project time without compromising structural integrity or safety.
Authors
- Adeyele
- Akinwale O
- Coker
- Tayo Mathew
Institutions
- University of Ibadan (NG)
Publication Details
- Journal
- Iconic Research and Engineering Journals
- Published
- 2026-11-16
- DOI
- https://doi.org/10.64388/ire1725230
- Primary Topic
- Value Engineering and Management
- Type
- article
- Field-Weighted Citation Impact
- 0.00