The Iodine Is Real. It Comes Out Without the $21,300. (Produced Water Valorization, Part 5)
Permian brine carries iodine at about the grade Japan produces from gas field brine. Iodine strips from raw brine at the disposal well. The treatment plant adds nothing to it, so it cannot be booked against the cost of clean water. Part 5 of 5 in the RWI Produced Water Valorization series. Basis: Texas Produced Water Consortium, 2026 report to the Texas Legislature: $2.75 per barrel of product at 50 percent recovery, $21,300 per acre-foot of clean water. Graphic, 2160 px wide. Sources are listed on the graphic. Competing interest: Resource West Inc. sells evaporation equipment used in produced water management.
Authors
- Robert Ballantyne
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-16
- DOI
- https://doi.org/10.5281/zenodo.24293260
- Primary Topic
- Wastewater Treatment and Reuse
- Type
- article
- Field-Weighted Citation Impact
- 0.00