Termination-readiness governance: real options in governance to stop, reset or continue public megaprojects

Purpose This article examines how public megaproject governance can preserve meaningful choices to stop, fundamentally reset or continue as commitments accumulate. Design/methodology/approach A theory-elaborating documentary study of Muskrat Falls uses an author-developed Signals–Adaptations–Calculative Spaces–Outcomes (SACO) classification. Six documentary clusters are analysed through decision episodes, distinguishing information availability, transmission, interpretation and action. Findings Non-continuation alternatives were formally considered, but information, comparative preparation and implementation capacity were unevenly supported across successive commitments. Information did not always reach authorised forums before commitment. The Inquiry placed the point of no return at Financial Close; the 2016 review does not establish another practicable project-level window. Contractor-level flexibility persisted alongside constrained project-level alternatives. The analysis distinguishes transmission failures from normalisation of received information and lock-in through commitments. Originality/value Termination-readiness governance connects termination capability, project governance and real-options reasoning through the changing relationship between authority, decision readiness and implementation feasibility. Four dimensions organise proposed arrangements for preserving choice: Options and Baselines; Gates and Assurance; Stakeholder and Knowledge; and Execution and Legacy. The framework distinguishes a trigger for reconsideration from a predetermined termination decision and yields four propositions for subsequent examination. Its effectiveness is not established by the case.

Authors

Institutions

Publication Details

Journal
International Journal of Managing Projects in Business
Published
2026-11-16
DOI
https://doi.org/10.1108/ijmpb-12-2025-0535
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Termination-readiness governance: real options in governance to stop, reset or continue public megaprojects

Davar Rezania, Neal Willcott, Ryan Stack, Thomas W. Cooper et al.
1 links
International Journal of Managing Projects in Business
Construction Project Management and Performance
article

Termination-readiness governance: real options in governance to stop, reset or continue public megaprojects

Davar Rezania, Neal Willcott, Ryan Stack, Thomas W. Cooper, Mohammad H. Dinpajooh
article en

Abstract

Purpose This article examines how public megaproject governance can preserve meaningful choices to stop, fundamentally reset or continue as commitments accumulate. Design/methodology/approach A theory-elaborating documentary study of Muskrat Falls uses an author-developed Signals–Adaptations–Calculative Spaces–Outcomes (SACO) classification. Six documentary clusters are analysed through decision episodes, distinguishing information availability, transmission, interpretation and action. Findings Non-continuation alternatives were formally considered, but information, comparative preparation and implementation capacity were unevenly supported across successive commitments. Information did not always reach authorised forums before commitment. The Inquiry placed the point of no return at Financial Close; the 2016 review does not establish another practicable project-level window. Contractor-level flexibility persisted alongside constrained project-level alternatives. The analysis distinguishes transmission failures from normalisation of received information and lock-in through commitments. Originality/value Termination-readiness governance connects termination capability, project governance and real-options reasoning through the changing relationship between authority, decision readiness and implementation feasibility. Four dimensions organise proposed arrangements for preserving choice: Options and Baselines; Gates and Assurance; Stakeholder and Knowledge; and Execution and Legacy. The framework distinguishes a trigger for reconsideration from a predetermined termination decision and yields four propositions for subsequent examination. Its effectiveness is not established by the case.

International Journal of Managing Projects in Business
Acadia Pharmaceuticals (United States) (US), Memorial University of Newfoundland (CA), Memorial (RU), University of Guelph (CA), Acadia University (CA)
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon