Densimetric Froude Number in Turbidity Currents: The Critical Regime Between Erosion and Deposition

A turbidity current lives or dies by one ratio: its speed against the speed of waves on its own upper surface. Below that ratio the flow is tranquil and drops sediment; above it the flow is rapid, erosive and prone to mixing. Gauged currents from several canyons cluster near the boundary, which is why the ratio deserves a budget of its own. At a representative station the budget computes the ratio and everything tied to it: Richardson number as its inverse square, entrainment coefficient from the Parker relation, friction and settling numbers for the fine-sand load, plus the Chezy speed the local gradient would drive at standard drag. Headline values are fr40 bed slope fr40 = 0.015; fr40 runout distance km fr40 = 300; fr40 grain diameter um fr40 = 100; fr40 flow density kg m3 fr40 = 1076; fr40 excess density kg m3 fr40 = 48.69; fr40 reduced gravity m s2 fr40 = 0.444. The specific-energy entry prices what the current spends to stay in that state, metre by metre down the pathway.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-16
DOI
https://doi.org/10.5281/zenodo.24283290
Primary Topic
Geological formations and processes
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Densimetric Froude Number in Turbidity Currents: The Critical Regime Between Erosion and Deposition

William Alexander Aldred
5 links
Zenodo (CERN European Organization for Nuclear Research)
Geological formations and processes
article

Densimetric Froude Number in Turbidity Currents: The Critical Regime Between Erosion and Deposition

William Alexander Aldred
article en

Abstract

A turbidity current lives or dies by one ratio: its speed against the speed of waves on its own upper surface. Below that ratio the flow is tranquil and drops sediment; above it the flow is rapid, erosive and prone to mixing. Gauged currents from several canyons cluster near the boundary, which is why the ratio deserves a budget of its own. At a representative station the budget computes the ratio and everything tied to it: Richardson number as its inverse square, entrainment coefficient from the Parker relation, friction and settling numbers for the fine-sand load, plus the Chezy speed the local gradient would drive at standard drag. Headline values are fr40 bed slope fr40 = 0.015; fr40 runout distance km fr40 = 300; fr40 grain diameter um fr40 = 100; fr40 flow density kg m3 fr40 = 1076; fr40 excess density kg m3 fr40 = 48.69; fr40 reduced gravity m s2 fr40 = 0.444. The specific-energy entry prices what the current spends to stay in that state, metre by metre down the pathway.

Zenodo (CERN European Organization for Nuclear Research)
Geological formations and processes
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon