Final Phase 2 Restoration Plan and Environmental Assessment #8.1: East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project
In 2022, the Louisiana Trustee Implementation Group3 (LA TIG) finalized Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats (RP/EA #8), which screened project alternatives at the conceptual design stage based on geographic location, immediacy, and sustainability of project benefits provided for those that could best restore injured wetlands, coastal, and nearshore habitats (WCNH). Through that analysis, the LA TIG narrowed the range of alternatives to a suite of projects, including the East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project. These two projects are proposed as “Phase 2” projects, as the engineering and design (E&D) phase (Phase 1) of the projects was funded through RP/EA #8.
Authors
- Louisiana Trustee Implementation Group
Publication Details
- Journal
- NOAA Institutional Repository
- Published
- 2026-11-16
- DOI
- https://doi.org/10.25923/hv63-np89
- Primary Topic
- Coastal wetland ecosystem dynamics
- Type
- article
- Field-Weighted Citation Impact
- 0.00