Final Phase 2 Restoration Plan and Environmental Assessment #8.1: East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project

In 2022, the Louisiana Trustee Implementation Group3 (LA TIG) finalized Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats (RP/EA #8), which screened project alternatives at the conceptual design stage based on geographic location, immediacy, and sustainability of project benefits provided for those that could best restore injured wetlands, coastal, and nearshore habitats (WCNH). Through that analysis, the LA TIG narrowed the range of alternatives to a suite of projects, including the East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project. These two projects are proposed as “Phase 2” projects, as the engineering and design (E&D) phase (Phase 1) of the projects was funded through RP/EA #8.

Authors

Publication Details

Journal
NOAA Institutional Repository
Published
2026-11-16
DOI
https://doi.org/10.25923/hv63-np89
Primary Topic
Coastal wetland ecosystem dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Final Phase 2 Restoration Plan and Environmental Assessment #8.1: East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project

Louisiana Trustee Implementation Group
2 links
NOAA Institutional Repository
Coastal wetland ecosystem dynamics
article

Final Phase 2 Restoration Plan and Environmental Assessment #8.1: East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project

Louisiana Trustee Implementation Group
article en

Abstract

In 2022, the Louisiana Trustee Implementation Group3 (LA TIG) finalized Restoration Plan and Environmental Assessment #8: Wetlands, Coastal, and Nearshore Habitats (RP/EA #8), which screened project alternatives at the conceptual design stage based on geographic location, immediacy, and sustainability of project benefits provided for those that could best restore injured wetlands, coastal, and nearshore habitats (WCNH). Through that analysis, the LA TIG narrowed the range of alternatives to a suite of projects, including the East Orleans Landbridge Restoration Project and Raccoon Island Restoration Project. These two projects are proposed as “Phase 2” projects, as the engineering and design (E&D) phase (Phase 1) of the projects was funded through RP/EA #8.

NOAA Institutional Repository
Coastal wetland ecosystem dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon