Enhanced Disturbance-Rejection Generalized Predictive Control for a Large-Delay Boiler Water Dosing Process
Boiler water phosphate dosing is characterized by large transport delays, model uncertainty, and external disturbances, making accurate concentration regulation challenging. This paper proposes an extended-state-observer-assisted generalized predictive control (ESO-GPC) strategy for large-delay phosphate-dosing processes. A stepwise GPC formulation is employed to simplify the control optimization, while a two-path Time-Delay Compensator (TDC) combines the nominal delay-free model response with measured plant feedback to alleviate the effects of transport delay. A fal-based nonlinear speed-planning mechanism is further introduced after ESO disturbance compensation to adjust positive control-input increments as the applied command approaches a prescribed upper reference boundary, thereby promoting smoother control actions. Comparative simulations under model mismatch, additional transport delay, and external disturbances are conducted against Smith-GPC, ADRC, and PID controllers. Simulation results show that, with an additional 50 s transport delay, ESO-GPC reduces overshoot from 35.35% to 20.99% and cumulative control-input variation by 49.59% compared with Smith-GPC. The TDC ablation study further demonstrates a 39.35% reduction in control-input variation when fal attenuation is enabled. Industrial operating results, including measured phosphate-concentration trends, support the practical applicability of the proposed control framework.
Authors
- Wei Ai (ORCID: https://orcid.org/0000-0002-3255-2008)
- Jiadong Wang (ORCID: https://orcid.org/0009-0004-3116-999X)
- Zikang Tang
- Ming Zhang
- Nan Zhao
Institutions
- South China University of Technology (CN)
Publication Details
- Journal
- Processes
- Published
- 2026-11-16
- DOI
- https://doi.org/10.3390/pr14223682
- Primary Topic
- Advanced Control Systems Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00