From Accurate Diagnosis to Operational Readiness: A Systematic Review and Predictive Maintenance Readiness Model for Renewable Energy Assets

Predictive maintenance (PdM) for renewable-energy assets has advanced rapidly, yet high diagnostic accuracy does not necessarily indicate operational readiness. This systematic review introduces an eight-dimension Predictive Maintenance Readiness Model (PMRM) to separate algorithmic performance from deployment maturity. Following PRISMA 2020, 1421 database records were identified; after removal of 471 duplicates, 950 records were screened, 545 reports were sought, 325 were assessed in full text, 220 reports were not retrieved, and 263 primary studies were included. PMRM scores data realism, validation rigor, robustness/generalization, prognostic or early-warning capability, explainability/trust, real-time deployment, maintenance-decision linkage and operational impact on a 0–2 scale (0–16 total). The mean PMRM score was 9.83/16 (95% CI 9.49–10.16); 82 studies (31.2%) were classified as High readiness, 139 (52.9%) as Moderate and 42 (16.0%) as Low. Validation rigor was near ceiling (mean 1.95/2), whereas operational impact was weakest (0.38/2), and only 14 studies (5.3%) reported measured operational outcomes at the highest level. Sensitivity analyses showed that the share of High readiness studies depends on the cutoff and weighting (20.0–45.0%), but the dimension profile was stable across all scenarios. Wind (n = 182) and PV/solar (n = 74) studies did not differ meaningfully in readiness (difference 0.20 points, 95% CI −0.53 to 0.94). Published renewable-energy PdM evidence therefore shows a persistent translation gap between accurate fault-diagnosis models and field-validated, explainable, decision-linked systems with measured operational value.

Authors

Institutions

Publication Details

Journal
Inventions
Published
2026-11-16
DOI
https://doi.org/10.3390/inventions11060124
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

From Accurate Diagnosis to Operational Readiness: A Systematic Review and Predictive Maintenance Readiness Model for Renewable Energy Assets

Ercan Aykut, Muhammet Cihat Mumcu, Kübra Erdoğan, İzzet Yavuz et al.
2 links
Inventions
Reliability and Maintenance Optimization
article

From Accurate Diagnosis to Operational Readiness: A Systematic Review and Predictive Maintenance Readiness Model for Renewable Energy Assets

Ercan Aykut, Muhammet Cihat Mumcu, Kübra Erdoğan, İzzet Yavuz, Sena Nur Benlı, Şehmus Turan
article en

Abstract

Predictive maintenance (PdM) for renewable-energy assets has advanced rapidly, yet high diagnostic accuracy does not necessarily indicate operational readiness. This systematic review introduces an eight-dimension Predictive Maintenance Readiness Model (PMRM) to separate algorithmic performance from deployment maturity. Following PRISMA 2020, 1421 database records were identified; after removal of 471 duplicates, 950 records were screened, 545 reports were sought, 325 were assessed in full text, 220 reports were not retrieved, and 263 primary studies were included. PMRM scores data realism, validation rigor, robustness/generalization, prognostic or early-warning capability, explainability/trust, real-time deployment, maintenance-decision linkage and operational impact on a 0–2 scale (0–16 total). The mean PMRM score was 9.83/16 (95% CI 9.49–10.16); 82 studies (31.2%) were classified as High readiness, 139 (52.9%) as Moderate and 42 (16.0%) as Low. Validation rigor was near ceiling (mean 1.95/2), whereas operational impact was weakest (0.38/2), and only 14 studies (5.3%) reported measured operational outcomes at the highest level. Sensitivity analyses showed that the share of High readiness studies depends on the cutoff and weighting (20.0–45.0%), but the dimension profile was stable across all scenarios. Wind (n = 182) and PV/solar (n = 74) studies did not differ meaningfully in readiness (difference 0.20 points, 95% CI −0.53 to 0.94). Published renewable-energy PdM evidence therefore shows a persistent translation gap between accurate fault-diagnosis models and field-validated, explainable, decision-linked systems with measured operational value.

InventionsVol. 11(6)
Sakarya University (TR), Ankara University (TR), İstanbul Gelişim Üniversitesi (TR), Sakarya Uygulamalı Bilimler Üniversitesi (TR), Adnan Menderes University (TR), Abdullah Gül University (TR)
Industry, innovation and infrastructure
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon