Alternatif Penggantian Metode Kerja Precast dengan Cast in Situ pada Proyek Saluran

The drainage improvement project on Jalan Kedurus Dukuh I and X, Surabaya, experienced changes in dimensions and construction methods due to the existing pump house drainage conditions. These conditions indicate the importance of adjusting the design based on actual field conditions so that changes in dimensions and construction methods can be evaluated technically and economically. This study aims to develop redesign drawings for Sections A, B, and C based on the initial design and as-built conditions, and to compare the realized construction costs with the costs resulting from the redesign. The study employed an evaluative case study approach through a review of DED documents, as-built drawings, MC-100, RAB, redesign drawings, and supporting data. Item costs were calculated by multiplying quantities by the unit prices in the workbook, while new items without comparable prices were calculated using AHSP 2025. The redesign restored the reference cross-section of the U-Ditch in Section A to 120 × 120 cm and proposed cast-in-situ construction at four conflict points. In Section B, a 120 × 150 cm U-Ditch with a 10-ton axle-load cover was applied at STA 0+000 and STA 0+025. In Section C, the outlet configuration was maintained with adjustments at the end section. The redesign cost was IDR 4,048,813,869.48, including 11% VAT, which was IDR 31,203.36 (0.00077%) lower than the cost based on MC-100. This total difference was not material and still requires verification of the cast-in-situ quantities and the equivalence of STA boundaries. The cost changes were mainly influenced by changes in the composition and quantities of drainage, earthwork, paving, and new work items, although the total redesign cost was relatively similar to the cost based on MC-100.

Authors

Institutions

Publication Details

Journal
Jurnal Sains dan Teknologi (JSIT)
Published
2026-11-16
DOI
https://doi.org/10.47233/jsit.v6i3.5420
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Alternatif Penggantian Metode Kerja Precast dengan Cast in Situ pada Proyek Saluran

Mochamad Firmansyah, Fahrezy Damaryanto
Jurnal Sains dan Teknologi (JSIT)
Construction Project Management and Performance
article

Alternatif Penggantian Metode Kerja Precast dengan Cast in Situ pada Proyek Saluran

Mochamad Firmansyah, Fahrezy Damaryanto
article en

Abstract

The drainage improvement project on Jalan Kedurus Dukuh I and X, Surabaya, experienced changes in dimensions and construction methods due to the existing pump house drainage conditions. These conditions indicate the importance of adjusting the design based on actual field conditions so that changes in dimensions and construction methods can be evaluated technically and economically. This study aims to develop redesign drawings for Sections A, B, and C based on the initial design and as-built conditions, and to compare the realized construction costs with the costs resulting from the redesign. The study employed an evaluative case study approach through a review of DED documents, as-built drawings, MC-100, RAB, redesign drawings, and supporting data. Item costs were calculated by multiplying quantities by the unit prices in the workbook, while new items without comparable prices were calculated using AHSP 2025. The redesign restored the reference cross-section of the U-Ditch in Section A to 120 × 120 cm and proposed cast-in-situ construction at four conflict points. In Section B, a 120 × 150 cm U-Ditch with a 10-ton axle-load cover was applied at STA 0+000 and STA 0+025. In Section C, the outlet configuration was maintained with adjustments at the end section. The redesign cost was IDR 4,048,813,869.48, including 11% VAT, which was IDR 31,203.36 (0.00077%) lower than the cost based on MC-100. This total difference was not material and still requires verification of the cast-in-situ quantities and the equivalence of STA boundaries. The cost changes were mainly influenced by changes in the composition and quantities of drainage, earthwork, paving, and new work items, although the total redesign cost was relatively similar to the cost based on MC-100.

Jurnal Sains dan Teknologi (JSIT)Vol. 6(3)
Universitas 17 Agustus 1945 Surabaya (ID)
Industry, innovation and infrastructure, Sustainable cities and communities
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon