Design Blueprint: Reversible Francis Pump-Turbine for a Two-Reservoir Pumped-Storage Plant: Round-Trip, Storage Volume and Duty Budgets for a 38 Megawatt Station

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24242943): This paper presents a computed design for a single-stage reversible Francis pump-turbine at a paired reservoirs on a high plateau, operating on the following principle: one hydraulic machine runs in both directions: as a turbine when water falls from the upper reservoir, and as a pump, driven by the same electrical machine acting as a motor, when surplus electricity lifts water back up. The upper reservoir stores 216 megawatt-hours of deliverable energy, the station discharges at 38,235 kilowatts for about 5.7 hours, and the round trip returns 78% of the electricity used to charge it. Pumped storage is an energy-shifting device, not an energy source, and its budget must therefore be kept in two currencies at once: power, which the machine sizes, and stored energy, which the reservoir sizes. This study works both, together with the round-trip efficiency that prices the shifting, the deep submergence a pump-turbine runner needs to avoid cavitation in both modes, and the duty pattern that the stored volume implies. All sizing follows from computed head, flow, turbine-efficiency, cavitation and, where the design stores energy, storage budgets, each worked in the deposited calculation script from stated inputs. The study is a design exercise for civilian electricity production; it is simulated, not measured, and no part of it concerns any weapon or targeting application. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian hydroelectric energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-15
DOI
https://doi.org/10.5281/zenodo.24243175
Primary Topic
Cavitation Phenomena in Pumps
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Design Blueprint: Reversible Francis Pump-Turbine for a Two-Reservoir Pumped-Storage Plant: Round-Trip, Storage Volume and Duty Budgets for a 38 Megawatt Station

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Cavitation Phenomena in Pumps
article

Design Blueprint: Reversible Francis Pump-Turbine for a Two-Reservoir Pumped-Storage Plant: Round-Trip, Storage Volume and Duty Budgets for a 38 Megawatt Station

William Alexander Aldred
article en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24242943): This paper presents a computed design for a single-stage reversible Francis pump-turbine at a paired reservoirs on a high plateau, operating on the following principle: one hydraulic machine runs in both directions: as a turbine when water falls from the upper reservoir, and as a pump, driven by the same electrical machine acting as a motor, when surplus electricity lifts water back up. The upper reservoir stores 216 megawatt-hours of deliverable energy, the station discharges at 38,235 kilowatts for about 5.7 hours, and the round trip returns 78% of the electricity used to charge it. Pumped storage is an energy-shifting device, not an energy source, and its budget must therefore be kept in two currencies at once: power, which the machine sizes, and stored energy, which the reservoir sizes. This study works both, together with the round-trip efficiency that prices the shifting, the deep submergence a pump-turbine runner needs to avoid cavitation in both modes, and the duty pattern that the stored volume implies. All sizing follows from computed head, flow, turbine-efficiency, cavitation and, where the design stores energy, storage budgets, each worked in the deposited calculation script from stated inputs. The study is a design exercise for civilian electricity production; it is simulated, not measured, and no part of it concerns any weapon or targeting application. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian hydroelectric energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Cavitation Phenomena in Pumps
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Design Blueprint: Reversible Francis Pump-Turbine for a Two-Reservoir Pumped-Storage Plant: Round-Trip, Storage Volume and Duty Budgets for a 38 Megawatt Station — William Alexander Aldred · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS