Analysis of Labor Coefficients Based on Labor Productivity in Palembang City

The construction industry is a major contributor to Indonesia’s infrastructure development, covering various civil engineering works, including buildings, highways, bridges, and other infrastructure facilities. The achievement of construction project objectives depends on effective planning, appropriate management practices, and the competence of the workforce involved. Effective construction planning requires competent workers and adequate productivity. Project scheduling helps organize activities, allocate resources, and control progress, with work durations largely influenced by labor requirements and productivity. In Indonesia, labor needs are estimated using standardized coefficients from the Indonesia National standard (SNI) and Work Unit Price Analysis (AHSP), which serve as references for construction planning and cost estimation. Field data were obtained through on-site surveys conducted using interviews and questionnaire distribution. The questionnaire responses were subsequently compiled and analyzed using Microsoft Excel to identify the types of work, their respective cost value, and time required to complete each activity. The collected data were further examined to evaluate workforce productivity and establish the labor coefficients reflecting actual construction site performance. Based on the data processing result, the daily working time was established as 8 hours. For reinforcement work, 4 workers were required to complete a work volume of 65 kg within 5 days. Based on the field observations, the labor productivity of reinforcement workers was determined to be 130 kg/worker-day, with a labor coefficient of 0,0077 OH/kg. For formwork activities, 5 workers were required to complete a work volume of 1,5 m² within 5 days. The resulting labor productivity of carpenters was 0,3 m²/worker-days, with a corresponding labor coefficient of 0,3333 OH/m². Furthermore, for concrete casting activities, 4 workers were required to completed a work volume of 0,8 m³ within 5 days. The resulting labor productivity of concrete workers was 3,2 m³/worker-day, with a corresponding labor coefficient of 0,3125 OH/m³. Following the data analysis, a comparative assessment was conducted between the labor coefficients obtained from field observations and those specified in the AHSP issued by the PUPR of Palembang City. For reinforcement work, the labor coefficient obtained from the field observations was 0,0077 OH/kg, compared with 0,0070 OH/kg specified in the AHSP. For formwork activities, the field-based labor coefficient was 0,3333 OH/m², whereas he AHSP coefficient was 0,3300 OH/m². Meanwhile, for concrete casting activities, the labor coefficient obtained from the field observations concrete casting activities, the labor coefficient obtained from the field observations was 0,3125 OH/m³, compared with 0,2750 specified in the AHSP.

Authors

Publication Details

Journal
Journal of Infrastructure and Civil Engineering
Published
2026-11-14
DOI
https://doi.org/10.35583/jice.v6i3.248
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Analysis of Labor Coefficients Based on Labor Productivity in Palembang City

Lutfia Salsabila, Sudarmadji Sudarmadji, Lega Reskita Lubis, Rianti Patricia et al.
Journal of Infrastructure and Civil Engineering
Construction Project Management and Performance
article

Analysis of Labor Coefficients Based on Labor Productivity in Palembang City

Lutfia Salsabila, Sudarmadji Sudarmadji, Lega Reskita Lubis, Rianti Patricia, Zalika Aulia Madani, Rahmad Hidayat Saputra
article en

Abstract

The construction industry is a major contributor to Indonesia’s infrastructure development, covering various civil engineering works, including buildings, highways, bridges, and other infrastructure facilities. The achievement of construction project objectives depends on effective planning, appropriate management practices, and the competence of the workforce involved. Effective construction planning requires competent workers and adequate productivity. Project scheduling helps organize activities, allocate resources, and control progress, with work durations largely influenced by labor requirements and productivity. In Indonesia, labor needs are estimated using standardized coefficients from the Indonesia National standard (SNI) and Work Unit Price Analysis (AHSP), which serve as references for construction planning and cost estimation. Field data were obtained through on-site surveys conducted using interviews and questionnaire distribution. The questionnaire responses were subsequently compiled and analyzed using Microsoft Excel to identify the types of work, their respective cost value, and time required to complete each activity. The collected data were further examined to evaluate workforce productivity and establish the labor coefficients reflecting actual construction site performance. Based on the data processing result, the daily working time was established as 8 hours. For reinforcement work, 4 workers were required to complete a work volume of 65 kg within 5 days. Based on the field observations, the labor productivity of reinforcement workers was determined to be 130 kg/worker-day, with a labor coefficient of 0,0077 OH/kg. For formwork activities, 5 workers were required to complete a work volume of 1,5 m² within 5 days. The resulting labor productivity of carpenters was 0,3 m²/worker-days, with a corresponding labor coefficient of 0,3333 OH/m². Furthermore, for concrete casting activities, 4 workers were required to completed a work volume of 0,8 m³ within 5 days. The resulting labor productivity of concrete workers was 3,2 m³/worker-day, with a corresponding labor coefficient of 0,3125 OH/m³. Following the data analysis, a comparative assessment was conducted between the labor coefficients obtained from field observations and those specified in the AHSP issued by the PUPR of Palembang City. For reinforcement work, the labor coefficient obtained from the field observations was 0,0077 OH/kg, compared with 0,0070 OH/kg specified in the AHSP. For formwork activities, the field-based labor coefficient was 0,3333 OH/m², whereas he AHSP coefficient was 0,3300 OH/m². Meanwhile, for concrete casting activities, the labor coefficient obtained from the field observations concrete casting activities, the labor coefficient obtained from the field observations was 0,3125 OH/m³, compared with 0,2750 specified in the AHSP.

Journal of Infrastructure and Civil Engineering
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon