On the role of integer ambiguity resolution in the continuity of IPPP time links

Abstract This study investigates how ambiguity resolution strategies affect the continuity of Global Navigation Satellite System (GNSS) Integer Precise Point Positioning (IPPP) time and frequency transfer. Although Undifferenced (UD) and Single-Differenced (SD) ambiguity resolution provide equivalent positioning accuracy, their different ambiguity datum realizations lead to fundamentally different receiver clock characteristics. UD ambiguity resolution establishes an integer ambiguity datum that is mapped into the receiver clock, making discontinuities between independently initialized arcs recoverable by integer-cycle calibration. In contrast, SD ambiguity resolution constrains only relative ambiguities, leaving the receiver clock datum referenced to pseudorange observations without such an integer constraint. We generated 35 d of GPS IPPP links among 13 stations using PRIDE-PPPAR software, with batch lengths of 1 h, 3 h, 6 h, 12 h, 1 d, 3 d, 7 d, 10 d, and 15 d. The results show that Arc Boundary Discontinuities (ABDs) in UD-based links are precisely distributed at integer values, whereas SD-based and float PPP links exhibit no clear integer characteristics. After correcting these discontinuities using integer cycles, the mean Root Mean Square (RMS) of ABD residuals is 20 ps for UD-based IPPP links. For solutions based on 1-day batch, the Standard Deviations (STDs) of the differences between UD-based, SD-based and float links with respect to optical fiber link are 170 ps, 330 ps and 770 ps, respectively. Evaluated using Allan deviations, over 80% of UD-based links demonstrate better frequency stability than SD-based links at an averaging time of 3 d. UD-based links also show consistent frequency stability across different batch lengths, whereas SD-based and float links do not. Specifically, at a 1-day averaging time, the median frequency stability of UD-based links is $$9 \times 10^{-16}$$ 9 × 10 - 16 for 3-hour batches and $$7.3 \times 10^{-16}$$ 7.3 × 10 - 16 for 15-day batches, compared to $$1.6 \times 10^{-15}$$ 1.6 × 10 - 15 and $$7.2 \times 10^{-16}$$ 7.2 × 10 - 16 for SD-based links. These results demonstrate that the integer ambiguity datum of UD ambiguity resolution enables reliable recovery of IPPP time link continuity after ambiguity reinitialization.

Authors

Publication Details

Journal
Satellite Navigation
Published
2026-11-16
DOI
https://doi.org/10.1186/s43020-026-00233-9
Primary Topic
GNSS positioning and interference
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

On the role of integer ambiguity resolution in the continuity of IPPP time links

Giulio Tagliaferro, Jiang Guo
Satellite Navigation
GNSS positioning and interference
article

On the role of integer ambiguity resolution in the continuity of IPPP time links

Giulio Tagliaferro, Jiang Guo
article en

Abstract

Abstract This study investigates how ambiguity resolution strategies affect the continuity of Global Navigation Satellite System (GNSS) Integer Precise Point Positioning (IPPP) time and frequency transfer. Although Undifferenced (UD) and Single-Differenced (SD) ambiguity resolution provide equivalent positioning accuracy, their different ambiguity datum realizations lead to fundamentally different receiver clock characteristics. UD ambiguity resolution establishes an integer ambiguity datum that is mapped into the receiver clock, making discontinuities between independently initialized arcs recoverable by integer-cycle calibration. In contrast, SD ambiguity resolution constrains only relative ambiguities, leaving the receiver clock datum referenced to pseudorange observations without such an integer constraint. We generated 35 d of GPS IPPP links among 13 stations using PRIDE-PPPAR software, with batch lengths of 1 h, 3 h, 6 h, 12 h, 1 d, 3 d, 7 d, 10 d, and 15 d. The results show that Arc Boundary Discontinuities (ABDs) in UD-based links are precisely distributed at integer values, whereas SD-based and float PPP links exhibit no clear integer characteristics. After correcting these discontinuities using integer cycles, the mean Root Mean Square (RMS) of ABD residuals is 20 ps for UD-based IPPP links. For solutions based on 1-day batch, the Standard Deviations (STDs) of the differences between UD-based, SD-based and float links with respect to optical fiber link are 170 ps, 330 ps and 770 ps, respectively. Evaluated using Allan deviations, over 80% of UD-based links demonstrate better frequency stability than SD-based links at an averaging time of 3 d. UD-based links also show consistent frequency stability across different batch lengths, whereas SD-based and float links do not. Specifically, at a 1-day averaging time, the median frequency stability of UD-based links is $$9 \times 10^{-16}$$ 9 × 10 - 16 for 3-hour batches and $$7.3 \times 10^{-16}$$ 7.3 × 10 - 16 for 15-day batches, compared to $$1.6 \times 10^{-15}$$ 1.6 × 10 - 15 and $$7.2 \times 10^{-16}$$ 7.2 × 10 - 16 for SD-based links. These results demonstrate that the integer ambiguity datum of UD ambiguity resolution enables reliable recovery of IPPP time link continuity after ambiguity reinitialization.

Satellite NavigationVol. 7(1)
GNSS positioning and interference
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon