False Transformer Pressure Trip and Failure of Automatic Bus Transfer: A Real Case Study of Incomer Loss and ATS Malfunction in a Petroleum Facility Substation

This paper presents a real case study of a simultaneous protection and automatic transfer failure in substation of a petroleum facility in Egypt. On 12 March 2026 at 20:25, Transformer TR-A tripped on a transformer pressure trip indication via the RET620 protection relay, causing Incomer A of PMCC to go out of service and an under-voltage condition on the corresponding bus section. Although the bus coupler was in AUTO mode and Incomer B remained energized, the Automatic Transfer Scheme (ATS) failed to close the bus coupler automatically, resulting in load interruption and fan shutdown. Power was restored by manual closing of the bus coupler, after which Transformer TR-B supplied both bus sections. Post-event inspection revealed no internal transformer fault. Insulation resistance was 6.84 GΩ on the HV side and 6.76 GΩ on the LV side, and winding resistance values were within normal limits. No fresh oil leakage was observed at the Pressure Relief Valve (PRV). Burn marks and thermal damage were observed on the CT protection terminal block XA2 (XA2-1 to XA2-6) between the busbar CTs and the SEPAM relay. The transformer was monitored energized without load for two days. A functional test on 15 March 2026, by simulating a pressure trip signal to the RET620 relay, confirmed correct tripping of TR-A and successful automatic closing of the bus coupler, proving the ATS operated normally after the event. Keywords: Transformer Protection, RET620, Pressure Trip, Automatic Transfer Scheme, Bus Coupler, Incomer Trip, Substation Reliability, Petroleum Facility, CT Terminal Block, False Trip

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-15
DOI
https://doi.org/10.5281/zenodo.24247089
Primary Topic
Power Systems Fault Detection
Type
preprint
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
preprint

False Transformer Pressure Trip and Failure of Automatic Bus Transfer: A Real Case Study of Incomer Loss and ATS Malfunction in a Petroleum Facility Substation

Mohamed Magdy sayed Mostafa
Zenodo (CERN European Organization for Nuclear Research)
Power Systems Fault Detection
preprint

False Transformer Pressure Trip and Failure of Automatic Bus Transfer: A Real Case Study of Incomer Loss and ATS Malfunction in a Petroleum Facility Substation

Mohamed Magdy sayed Mostafa
preprint en

Abstract

This paper presents a real case study of a simultaneous protection and automatic transfer failure in substation of a petroleum facility in Egypt. On 12 March 2026 at 20:25, Transformer TR-A tripped on a transformer pressure trip indication via the RET620 protection relay, causing Incomer A of PMCC to go out of service and an under-voltage condition on the corresponding bus section. Although the bus coupler was in AUTO mode and Incomer B remained energized, the Automatic Transfer Scheme (ATS) failed to close the bus coupler automatically, resulting in load interruption and fan shutdown. Power was restored by manual closing of the bus coupler, after which Transformer TR-B supplied both bus sections. Post-event inspection revealed no internal transformer fault. Insulation resistance was 6.84 GΩ on the HV side and 6.76 GΩ on the LV side, and winding resistance values were within normal limits. No fresh oil leakage was observed at the Pressure Relief Valve (PRV). Burn marks and thermal damage were observed on the CT protection terminal block XA2 (XA2-1 to XA2-6) between the busbar CTs and the SEPAM relay. The transformer was monitored energized without load for two days. A functional test on 15 March 2026, by simulating a pressure trip signal to the RET620 relay, confirmed correct tripping of TR-A and successful automatic closing of the bus coupler, proving the ATS operated normally after the event. Keywords: Transformer Protection, RET620, Pressure Trip, Automatic Transfer Scheme, Bus Coupler, Incomer Trip, Substation Reliability, Petroleum Facility, CT Terminal Block, False Trip

Zenodo (CERN European Organization for Nuclear Research)
Power Systems Fault Detection
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
False Transformer Pressure Trip and Failure of Automatic Bus Transfer: A Real Case Study of Incomer Loss and ATS Malfunction in a Petroleum Facility Substation — Mohamed Magdy sayed Mostafa · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS