Frazil Blockage of a Canal Plant's Intake Racks: Capture, Constriction and the Head-Loss Runaway
A hydroelectric plant on a northern river can be starved by ice it cannot see: frazil crystals, grown in the supercooled canal upstream, adhering to the trash racks until the intake chokes. This paper budgets that blockage for a Beauharnois-type plant on the St. Lawrence system, where frazil management is a mature operational art. Canal water carrying frazil at 0.02 percent by volume delivers 0.19 cubic metres of ice per second past a rack face of 2600 square metres at an approach velocity of 0.37 metres per second. If eight percent of the arriving crystals adhere — a stated capture allowing that most pass through the bar spacing untouched and only a share of those that touch cold steel freeze to it — the racks accumulate ice at 0.02 cubic metres per second, growing a porous layer across the face at 4 centimetres per hour. Half the rack's open area is gone in about 4 hours, and because rack head loss scales with the inverse square of the open fraction, the loss at that point is 4 times its clean value while the velocity through the surviving openings has doubled. The plant's mortal problem is the runaway that follows: each increment of blockage raises the velocity through the remaining openings, which delivers crystals to their bars faster, which blocks faster. The budget's timescale, hours rather than days, matches the operational reality that frazil at intakes is fought in real time, with heated bars, backflushing and load reductions, on the night it arrives.
Authors
- William Alexander Aldred (ORCID: https://orcid.org/0009-0000-1215-577X)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-15
- DOI
- https://doi.org/10.5281/zenodo.24248474
- Primary Topic
- Hydraulic flow and structures
- Type
- article
- Field-Weighted Citation Impact
- 0.00