Flood-Peak Timing on the Russian River: Lag Budget from Transport Peak to the Guerneville Crest of February 2019
In late February 2019 a slow atmospheric river soaked the Russian River basin on already wet ground, and the river at Guerneville crested at 45.38 feet on 27 February, its highest level since 1995, isolating the town as water covered the surrounding lowlands; the crest arrived roughly a day after the heaviest rain and the peak of onshore transport. The lag between atmospheric peak and river crest is a sum of physical delays: hillslope and small-channel delivery, main-stem translation at flood celerity over the basin's channel length, and storage filling in floodplain and reservoir margins; the budget adds those delays explicitly and compares their total with the observed interval between transport maximum and gauged crest. Headline values are russian channel length km guerneville = 110; russian flood celerity m per s guerneville = 1.6; russian mainstem travel hours guerneville = 19.1; russian hillslope delay hours guerneville = 6; russian storage delay hours guerneville = 3; russian total lag hours guerneville = 28.1. The residual between budgeted and observed lag is printed rather than tuned away, since that residual is the honest measure of the method.
Authors
- William Alexander Aldred (ORCID: https://orcid.org/0009-0000-1215-577X)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-16
- DOI
- https://doi.org/10.5281/zenodo.24265199
- Primary Topic
- Hydrology and Watershed Management Studies
- Type
- article
- Field-Weighted Citation Impact
- 0.00