Dam and Reservoir Rapid-Shutdown Warning: Detection Latency, Gate Travel and Drawdown Budgets

Strong-motion sensors on a dam's abutments and gallery, backed by a small upstream seismic array, command spillway gates to safe positions, close outlet valves and alert the downstream valley the moment damaging shaking is declared, because a dam's dangerous decisions must be taken in minutes, not after an inspection convoy arrives. Its operating principle: abutment and upstream sensors commanding gates, valves and downstream alerts automatically when damaging shaking is declared. Headline values are dam p travel dam to nearest station dam s = 1.856; dam detection latency dam s = 4.505; dam total alert dam latency s = 7.005; dam blind zone dam radius km = 22.38; dam warning time dam at 50 km dam s = 7.564; dam warning time dam at 100 km dam s = 21.71. Mechanical travel times dwarf electronic latencies here, and the entries are ordered to make that hierarchy impossible to miss. SIMULATED, NOT MEASURED. In the protection of downstream residents and public infrastructure, this computed study treats the dam system as protective only, with nothing in it usable for targeting or as a weapon against any individual, government or terrestrial object.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-16
DOI
https://doi.org/10.5281/zenodo.24265175
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Dam and Reservoir Rapid-Shutdown Warning: Detection Latency, Gate Travel and Drawdown Budgets

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Dam Engineering and Safety
article

Dam and Reservoir Rapid-Shutdown Warning: Detection Latency, Gate Travel and Drawdown Budgets

William Alexander Aldred
article en

Abstract

Strong-motion sensors on a dam's abutments and gallery, backed by a small upstream seismic array, command spillway gates to safe positions, close outlet valves and alert the downstream valley the moment damaging shaking is declared, because a dam's dangerous decisions must be taken in minutes, not after an inspection convoy arrives. Its operating principle: abutment and upstream sensors commanding gates, valves and downstream alerts automatically when damaging shaking is declared. Headline values are dam p travel dam to nearest station dam s = 1.856; dam detection latency dam s = 4.505; dam total alert dam latency s = 7.005; dam blind zone dam radius km = 22.38; dam warning time dam at 50 km dam s = 7.564; dam warning time dam at 100 km dam s = 21.71. Mechanical travel times dwarf electronic latencies here, and the entries are ordered to make that hierarchy impossible to miss. SIMULATED, NOT MEASURED. In the protection of downstream residents and public infrastructure, this computed study treats the dam system as protective only, with nothing in it usable for targeting or as a weapon against any individual, government or terrestrial object.

Zenodo (CERN European Organization for Nuclear Research)
Dam Engineering and Safety
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Dam and Reservoir Rapid-Shutdown Warning: Detection Latency, Gate Travel and Drawdown Budgets — William Alexander Aldred · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS