Design Blueprint: Tidal Barrage Sluice-Turbine Pair Power: Estuary Potential Energy, Sluice Discharge and Two-Way Generation Budgets

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24238379): The barrage pair is presented here: a computed barrage pair design, rated at 72,307 kilowatts, on the barrage pair's single stated barrage pair operating principle: a barrage across an estuary pairs its turbines with large sluices that work as a team across the tide: sluices fill and empty the basin quickly when no head is available for generation, so the turbines spend more of each cycle at a useful head — the pair, not the turbine alone, is the operating principle. The barrage pair system is an estuary basin of 22 square kilometres with a tidal range of 8.2 metres, twenty-four turbines of 9 megawatts, and sluices of stated total area and discharge coefficient working under a stated filling head. The barrage pair's target is the barrage pair net average power from the basin potential-energy formula at a stated system efficiency, installed capacity, and the sluice discharge and filling time that show the sluices earning their place beside the turbines. For the barrage pair, the net output is 72,307 kilowatts, and the barrage pair's annual yield is 212 gigawatt-hours, at the barrage pair's capacity factor of 0.335. Per tide, the stored potential energy is 2.07 gigawatt-hours; the installed capacity stands at 216 megawatts; raw average power, before the system efficiency is applied, is 172 megawatts; and the sluices pass 5774 cubic metres per second at the stated filling head. No targeting or weapon application belongs to this design; it is a civilian-energy study, computed, whose results come from simulation on stated assumptions, unmeasured. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian wave and tidal energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-15
DOI
https://doi.org/10.5281/zenodo.24238741
Primary Topic
Wave and Wind Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Design Blueprint: Tidal Barrage Sluice-Turbine Pair Power: Estuary Potential Energy, Sluice Discharge and Two-Way Generation Budgets

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Wave and Wind Energy Systems
article

Design Blueprint: Tidal Barrage Sluice-Turbine Pair Power: Estuary Potential Energy, Sluice Discharge and Two-Way Generation Budgets

William Alexander Aldred
article en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24238379): The barrage pair is presented here: a computed barrage pair design, rated at 72,307 kilowatts, on the barrage pair's single stated barrage pair operating principle: a barrage across an estuary pairs its turbines with large sluices that work as a team across the tide: sluices fill and empty the basin quickly when no head is available for generation, so the turbines spend more of each cycle at a useful head — the pair, not the turbine alone, is the operating principle. The barrage pair system is an estuary basin of 22 square kilometres with a tidal range of 8.2 metres, twenty-four turbines of 9 megawatts, and sluices of stated total area and discharge coefficient working under a stated filling head. The barrage pair's target is the barrage pair net average power from the basin potential-energy formula at a stated system efficiency, installed capacity, and the sluice discharge and filling time that show the sluices earning their place beside the turbines. For the barrage pair, the net output is 72,307 kilowatts, and the barrage pair's annual yield is 212 gigawatt-hours, at the barrage pair's capacity factor of 0.335. Per tide, the stored potential energy is 2.07 gigawatt-hours; the installed capacity stands at 216 megawatts; raw average power, before the system efficiency is applied, is 172 megawatts; and the sluices pass 5774 cubic metres per second at the stated filling head. No targeting or weapon application belongs to this design; it is a civilian-energy study, computed, whose results come from simulation on stated assumptions, unmeasured. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian wave and tidal energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Wave and Wind Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon