Hospital and Laboratory Equipment Protection from Earthquake Warning: Alert Latency, Shutdown Sequence and Fragile-Load Budgets
A hospital campus subscribes to the regional warning feed and adds its own floor sensors; on alert, a sequenced controller pauses lifts at floors, closes laboratory gas lines, parks imaging gantries, switches surgical lights to battery and warns theatres, spending the warning seconds on the loads that cannot tolerate shaking in the order of their fragility. Its operating principle: a facility unit that spends incoming warning seconds on a pre-sequenced shutdown of fragile hospital and laboratory equipment. Headline values are hosp p travel hosp to nearest station hosp s = 2.455; hosp detection latency hosp s = 6.5; hosp total alert hosp latency s = 7.9; hosp blind zone hosp radius km = 25.37; hosp warning time hosp at 50 km hosp s = 6.727; hosp warning time hosp at 100 km hosp s = 20.84. Loads are budgeted individually rather than as one campus figure, because a warning that saves the gas lines but misses the operating theatre has failed at its purpose. SIMULATED, NOT MEASURED. For the safety of patients and staff inside one hospital campus, this computed unit is protective equipment logic only, with no targeting role and no weapon application against any patient, any state, or any terrestrial body.
Authors
- William Alexander Aldred (ORCID: https://orcid.org/0009-0000-1215-577X)
Publication Details
- Journal
- Zenodo (CERN European Organization for Nuclear Research)
- Published
- 2026-11-16
- DOI
- https://doi.org/10.5281/zenodo.24265271
- Primary Topic
- Seismology and Earthquake Studies
- Type
- article
- Field-Weighted Citation Impact
- 0.00