Design Blueprint: Crossflow Banki Turbine for a Village Micro-Hydro Scheme: Two-Stage Admission, Runner Length and Torque Budgets for a 74 Kilowatt Plant

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24242859): For a village stream above a small settlement, this study sizes a Banki crossflow turbine. The principle on which it converts water power is this: a rectangular jet enters a cylindrical runner of curved blades, crosses the interior, and strikes the blades a second time on the way out, so one admission does work in two passes and the machine tolerates very wide flow variation. The runner is 0.62 metres long and 0.30 metres in diameter; roughly 70% of the energy is taken on the first pass through the blades, and the plant delivers 73 kilowatts net, about 0.37 gigawatt-hours a year. Peak efficiency is deliberately traded for breadth: the crossflow runner accepts anything from a trickle to full flow without the sharp efficiency collapse of a fixed-geometry reaction runner, and its flat, fabricated construction suits local manufacture and repair. The budget therefore emphasises the admission split between the two blade passes and the torque available at the modest rotational speed. It also reports the output at the dry-season flow explicitly, because for a village supply the worst month, not the best, decides whether the scheme deserves to be built at all. The sizing rests throughout on worked budgets (head, discharge, machine efficiency, cavitation and, for storage designs, banked energy), computed by the accompanying script rather than asserted. The work is a simulated design study for civilian generation only; nothing in it is measured, and nothing in it serves a weapon or targeting purpose. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian hydroelectric energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-15
DOI
https://doi.org/10.5281/zenodo.24243094
Primary Topic
Cavitation Phenomena in Pumps
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Design Blueprint: Crossflow Banki Turbine for a Village Micro-Hydro Scheme: Two-Stage Admission, Runner Length and Torque Budgets for a 74 Kilowatt Plant

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Cavitation Phenomena in Pumps
article

Design Blueprint: Crossflow Banki Turbine for a Village Micro-Hydro Scheme: Two-Stage Admission, Runner Length and Torque Budgets for a 74 Kilowatt Plant

William Alexander Aldred
article en

Abstract

Design blueprint derived from the source paper (DOI 10.5281/zenodo.24242859): For a village stream above a small settlement, this study sizes a Banki crossflow turbine. The principle on which it converts water power is this: a rectangular jet enters a cylindrical runner of curved blades, crosses the interior, and strikes the blades a second time on the way out, so one admission does work in two passes and the machine tolerates very wide flow variation. The runner is 0.62 metres long and 0.30 metres in diameter; roughly 70% of the energy is taken on the first pass through the blades, and the plant delivers 73 kilowatts net, about 0.37 gigawatt-hours a year. Peak efficiency is deliberately traded for breadth: the crossflow runner accepts anything from a trickle to full flow without the sharp efficiency collapse of a fixed-geometry reaction runner, and its flat, fabricated construction suits local manufacture and repair. The budget therefore emphasises the admission split between the two blade passes and the torque available at the modest rotational speed. It also reports the output at the dry-season flow explicitly, because for a village supply the worst month, not the best, decides whether the scheme deserves to be built at all. The sizing rests throughout on worked budgets (head, discharge, machine efficiency, cavitation and, for storage designs, banked energy), computed by the accompanying script rather than asserted. The work is a simulated design study for civilian generation only; nothing in it is measured, and nothing in it serves a weapon or targeting purpose. Status: DESIGN BLUEPRINT — SIMULATED, NOT MEASURED — NOT BUILT. All numbers are simulated values from the source paper's computation, deposited with this blueprint as compute.py and results.json. The design is a civilian hydroelectric energy system and has no targeting or weapon application. AI-use disclosure: Dave, an AI research system, assisted with the computation and drafting under the author's direction; author of record William Alexander Aldred.

Zenodo (CERN European Organization for Nuclear Research)
Cavitation Phenomena in Pumps
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon
Design Blueprint: Crossflow Banki Turbine for a Village Micro-Hydro Scheme: Two-Stage Admission, Runner Length and Torque Budgets for a 74 Kilowatt Plant — William Alexander Aldred · Zenodo (CERN European Organization for Nuclear Research) (2026) | TGRS Research Map | TGRS