Building-Integrated Ducted Wind Turbine: Facade Acceleration, Duct Rotor and Urban Yield Budgets

This paper presents a computed building ducted turbine design, rated at 37.0 kilowatts, on a single stated operating principle: openings shaped through or between building masses concentrate the wind — the facade acts as a collector and the duct as a mild venturi — and small rotors inside the ducts harvest the accelerated flow at a site where a freestanding turbine could never be permitted. The system studied is three ducted rotors of 8 metres diameter set in openings between paired towers, with a duct speed-up factor of 1.35 at a free wind of 8 metres per second at roof height and rotor power coefficient 0.38. The target quantity is net electrical output from the combined duct area, the accelerated duct stream power and the stated coefficient, printed beside the honest urban capacity factor that decides whether the architecture or the energy is the real product. For the building ducted turbine, the net output is 37.0 kilowatts, and the annual yield is 0.052 gigawatt-hours, at a capacity factor of 0.16. Wind speed inside the ducts is 10.8 metres per second. Combined swept area is 151 square metres. Stream power in the ducts is 116 kilowatts. Rotor power before losses is 44.2 kilowatts. Civilian energy supply is the design's sole purpose; it has no targeting or weapon application, and the figures are simulated, not measured.

Authors

Publication Details

Journal
Zenodo (CERN European Organization for Nuclear Research)
Published
2026-11-15
DOI
https://doi.org/10.5281/zenodo.24239634
Primary Topic
Wind Energy Research and Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Building-Integrated Ducted Wind Turbine: Facade Acceleration, Duct Rotor and Urban Yield Budgets

William Alexander Aldred
Zenodo (CERN European Organization for Nuclear Research)
Wind Energy Research and Development
article

Building-Integrated Ducted Wind Turbine: Facade Acceleration, Duct Rotor and Urban Yield Budgets

William Alexander Aldred
article en

Abstract

This paper presents a computed building ducted turbine design, rated at 37.0 kilowatts, on a single stated operating principle: openings shaped through or between building masses concentrate the wind — the facade acts as a collector and the duct as a mild venturi — and small rotors inside the ducts harvest the accelerated flow at a site where a freestanding turbine could never be permitted. The system studied is three ducted rotors of 8 metres diameter set in openings between paired towers, with a duct speed-up factor of 1.35 at a free wind of 8 metres per second at roof height and rotor power coefficient 0.38. The target quantity is net electrical output from the combined duct area, the accelerated duct stream power and the stated coefficient, printed beside the honest urban capacity factor that decides whether the architecture or the energy is the real product. For the building ducted turbine, the net output is 37.0 kilowatts, and the annual yield is 0.052 gigawatt-hours, at a capacity factor of 0.16. Wind speed inside the ducts is 10.8 metres per second. Combined swept area is 151 square metres. Stream power in the ducts is 116 kilowatts. Rotor power before losses is 44.2 kilowatts. Civilian energy supply is the design's sole purpose; it has no targeting or weapon application, and the figures are simulated, not measured.

Zenodo (CERN European Organization for Nuclear Research)
Wind Energy Research and Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon