Project Resource Optimization and Successful Implementation of Road Construction Projects in Nairobi City County, Kenya
Purpose: The general objective of the study is to examine the influence of project resource optimization on successful implementation of road construction projects in Nairobi City County, Kenya. Specifically, the study sought to determine the influence of resource allocation and capacity planning on successful implementation of road construction projects in Nairobi City County, Kenya. This study was anchored on; Resource-Based View (RBV) and Systems Theory. Methodology: This study adopted a descriptive survey design, with road construction projects implemented by national road agencies (KURA, KeRRA, and KeNHA) as the unit of analysis and management employees involved in project implementation as the unit of observation. The target population comprised 695 respondents, including directors general, directors, procurement managers, project engineers, resident engineers, site engineers, and surveyors. Using Yamane’s (1967) formula, a sample size of 254 respondents was determined. Data were collected through structured questionnaires administered to a systematically selected sample. A pilot study involving 10% of the respondents was conducted in Kiambu County. Collected data were coded and analyzed using SPSS software. Results were presented through frequency tables, pie charts, and bar graphs. Both descriptive and inferential statistics were applied, while multiple linear regression analysis was used to examine causal relationships among study variables. Findings: The study concludes that resource allocation and capacity planning have a positive and significant effect on successful implementation of road construction projects in Nairobi City County, Kenya. Unique Contribution to Theory, Policy and Practice: Based on the findings, the study recommends that the management of road construction projects in Kenya should prioritize the timely and equitable allocation of financial, human, material, and equipment resources based on project needs and implementation schedules.
Authors
- Alexander Kyule
- Loyd Mutua
Publication Details
- Journal
- Journal of Entrepreneurship and Project Management
- Published
- 2026-11-15
- DOI
- https://doi.org/10.47941/jepm.4102
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 0.00