Project Estimator: A Role-Based Production-Estimation Model for Creative and Game Development Pipelines

Early-stage estimation remains one of the weakest points of creative production and game development. Teams commit to scope, budgets, and deadlines before the structure of the required work has been examined, and a single aggregate figure of hours conceals how the load falls across professional disciplines. This article formalizes a role-based production-estimation model represented as a task-role effort matrix, in which task quantities and per-unit role hours are used to derive role-level workloads, and describes its free, publicly available web implementation, Project Estimator. The model decomposes a project into task types, multiplies each type by its planned quantity, assigns the professional roles that participate in producing 1 unit, and attaches per-unit hours to each role. From these inputs, the model derives the total production volume, workload per discipline and per specialist, projected duration, required team composition, cost at given hourly rates, deadline feasibility, and production bottlenecks. Project duration is determined by the maximum role-level duration under the specified staffing and working-time assumptions, which distinguishes the model from aggregate schedule reasoning that divides total effort by total headcount. The argument follows a review format. The model grew out of more than 20 years of production practice; its spreadsheet predecessor was presented at an industry conference in 2021, and no primary usage data are reported. A worked example with a hypothetical 25-character project illustrates how the role-based view exposes a bottleneck that an aggregate estimate would hide. A structured comparison positions the model against task-management systems and software-estimation methods, and identifies its niche at the stage preceding project launch. Limitations regarding empirical validation and the quality of expert input are discussed, along with directions for future verification.

Authors

Publication Details

Journal
International Journal of Computer (IJC)
Published
2026-11-13
Primary Topic
Software Engineering Techniques and Practices
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
article

Project Estimator: A Role-Based Production-Estimation Model for Creative and Game Development Pipelines

Dmytrii Yeremenko
International Journal of Computer (IJC)
Software Engineering Techniques and Practices
article

Project Estimator: A Role-Based Production-Estimation Model for Creative and Game Development Pipelines

Dmytrii Yeremenko
article en

Abstract

Early-stage estimation remains one of the weakest points of creative production and game development. Teams commit to scope, budgets, and deadlines before the structure of the required work has been examined, and a single aggregate figure of hours conceals how the load falls across professional disciplines. This article formalizes a role-based production-estimation model represented as a task-role effort matrix, in which task quantities and per-unit role hours are used to derive role-level workloads, and describes its free, publicly available web implementation, Project Estimator. The model decomposes a project into task types, multiplies each type by its planned quantity, assigns the professional roles that participate in producing 1 unit, and attaches per-unit hours to each role. From these inputs, the model derives the total production volume, workload per discipline and per specialist, projected duration, required team composition, cost at given hourly rates, deadline feasibility, and production bottlenecks. Project duration is determined by the maximum role-level duration under the specified staffing and working-time assumptions, which distinguishes the model from aggregate schedule reasoning that divides total effort by total headcount. The argument follows a review format. The model grew out of more than 20 years of production practice; its spreadsheet predecessor was presented at an industry conference in 2021, and no primary usage data are reported. A worked example with a hypothetical 25-character project illustrates how the role-based view exposes a bottleneck that an aggregate estimate would hide. A structured comparison positions the model against task-management systems and software-estimation methods, and identifies its niche at the stage preceding project launch. Limitations regarding empirical validation and the quality of expert input are discussed, along with directions for future verification.

International Journal of Computer (IJC)
Software Engineering Techniques and Practices
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Laika access coming soon